I am wondering what the 90% in option 2 refer to. If I collect and use rainwater, I may use 90% of the annual rainwater on the site. But if I have any other of the listed sources (condensate from AHU cooling coils will be available almost everywhere), can I get the 90% point without using any other source than rainwater?
For the example rainwater, how would that be calculated? Site area x annual precipitation x run-off coefficient?
I think this is not really clear.
Additionally, how would "whether it meets the local standard wastewater" be documented?
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.