Forum discussion

NC-2009 SSc6.2:Stormwater Design—Quality Control

parking rainwater

For table SSC6.2-1, we dont know how to describe BMP neither its TSS removal efficiency, because the rain water from the parking is directed and collected to be sent to a vegetated site outside the leed boundary. What should i put in those spaces?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 07/02/2014 - 12:42

Hola Jorge, IMO, the description should be just what you wrote above "rain water from parking is collected to vegetated site". You can find the TSS rates in literature such as the NJ Stormwater Best Management Practices Manual: http://www.nj.gov/dep/stormwater/bmp_manual2.htm I hope this helps.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.