CS-2009 PIf1:Minimum Program Requirementsposted by Kathryn Van Nelson on
Who exactly registers a project with Energy Star's Portfolio Manager Tool?
Manufacturer Declaration
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Lilian Seow on
The tile contractor says they can't disclose their floor tile and stone supplier information.
parking rainwater
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by jorge calderon on
For table SSC6.2-1, we dont know how to describe BMP neither its TSS removal efficiency, because the rain water from the parking is directed and collected to be sent to a vegetated site outside the
90% refer to what?
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Jens Apel on
I am wondering what the 90% in option 2 refer to. If I collect and use rainwater, I may use 90% of the annual rainwater on the site.
applying only for EAc5.2 not EAc5.1
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Anna Bak on
Hi! Do you know if we can apply for EAc5.2 without applying for EAc5.1? The Investor doesn't want to pay for the model callibration, therefore we will not apply for EAc5.1.
clarification question on credit
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Melissa Elkins on
Our Engineering firm didn't include our water heating system in the original commissioning report, so our credit needs to be clarified - they did conduct a functional test so I'm wondering if I jus
Disinterested Sub-contractor of MEP Design Firm?
NC-2009 EAc3:Enhanced Commissioningposted by Anthea Ng on
Hello. For achieving EA C3 Enhanced Commissioning, Wwe noted the clause in guidebook "Must not be an employee of the design firm, though he or she may be contracted through them".
Ventilation - Proposed and Baseline per ASHRAE 62.1-2007?
NC-2009 EAp2:Minimum Energy Performanceposted by Todd Tewksbury on
Hi! I am conducting a LEED v2009 EAp2/c1 energy model for a nonresidential building that is more than 5 floors.
Expansion project FLUSH OUT
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Jorge Torres-Coto on
We have a project that is an expansion to an existing facility. It is NOT an addition.
Submitting for Review & Terminolgy
posted by Charles Nepps on
Just submitted a CI v2009 project for final (combined) review. Initially I was getting error messages that it could not be submitted unless all Prereqs & Credits were marked "complete".