Mats Not Needed
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Nate Gillette on
Hello, working with a resort that keeps the hallways, walkways, parking lot, you name it, in tip top shape. Areas are swept multiple times per day not allowing anything to accumulate.
Use of Section 438 for Option 1 Path 1
NC-v4 SSc4:Rainwater managementposted by Suzanne Johnson on
It is our understanding that Section 438 is used only to define the 95th percentile and that there is no requirement to follow Section 438 in full.
Choice between LEED NC & LEED HC
posted by Maya Karkour on
Dear All, We have a potential hospital outside the US which needs to be registered under LEED.
Modeling District Steam in Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Nicholas Young on
We are looking at an existing 300,000 s.f. hotel highrise in a downtown location that is currently on a citywide district steam utility.
LEED for Retail
Retail-NC-v2009 PIf1:Minimum Program Requirementsposted by Robert Wichert on
I have a new project which is going to be retail. The owner wants to use LEED for Retail.
MR Calcuation Cost
CS-2009 MRc4:Recycled Contentposted by Lilian Seow on
Re: 2009 CS For both options - Total Construction Cost and Default 45% - are taxes included?
Concerning ANSI/BIFMA manufacture date
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Jaida Anderson-Lozano on
Currently our furniture products use Greenguard Certificates and ANSI/BIFMA testing standard as compliance paths for this credit.
Natural Ventilation Software
CS-2009 IEQp1:Minimum IAQ Performanceposted by gabriel Morales on
Hello, To calculate computational fluid dynamic, it is possible to develop software Autodesk Ecotech? We appreciate the help.
IAQ Testing
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Brett Farbstein on
Can the Owner or GC do the IAQ test themselves ie be responsible for setting the test can and chain of custody to the lab?
first commissioning cycle
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by ethan adams on
OK, so.....if I haven't done any updates to the building in the 24 months prior to application for EBOM, then it's impossible to get EAc2.3, no matter how much the company might invest immediately