For both options - Total Construction Cost and Default 45% - are taxes included?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forForum discussion
CS-2009 MRc4: Recycled Content
Re: 2009 CS
For both options - Total Construction Cost and Default 45% - are taxes included?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
The recycled content percentage on the product data sheet is given as a range. What should I do?
Is the default average recycled content value of 25% for steel still allowed?
Can site materials, such as soil, be included in the MR credit calculations?
Are there recycled content claims that I should be wary of?
RETIRED
LEEDuser Expert
623 thumbs up
April 28, 2014 - 4:12 pm
Lilian - Yes. Actual construction costs typically have tax and hence it must be included. Remember this is the total cost of the construction job.