Forum quick links
LEED Canada Option 3 Public & Catholic Joint Use School
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Kelly Searle on
We are building a joint use school and trying to determine the likelihood of achieving 3 credits under SSc4.1 Alternative Transportation: Public Transportation Access - Option 3 (Transportation Dem
Option 3 for Catholic and Public Joint Use School
posted by Kelly Searle on
We are building a joint use school and trying to determine the likelihood of achieving 3 credits under SSc4.1 Alternative Transportation: Public Transportation Access - Option 3 (Transportation Dem
The difference of Reused, Salvaged, refurbished
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Qiang Zhang on
As posted for Materials reuse.
Tables titles missing
ND-v2009 SLLp4:Agricultural land conservationposted by Andres Schwarz on
On the SSLp4 Credit Language section, the titles of the tables are missing.
how long can be interval time between 2 parts of projects
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Catharina B on
Hello We are working on the project, which include 3 independent buildings: A, B & C – but for certification is one single building (each 17 stories above grade has own mechanic, energy system
Mixed-Use vs. Non-residential Classification for a Hotel
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Francis Porter on
Hi, I am working on a hotel which has several buildings, one main building, two different groups of clusters, 2 suite buildings, and a seperate back of house and a seperate employee residences.
LEED bledge
posted by Osama Hassan on
Dear all, we got LEED Gold certification for PNU-Acdemic campus ... so, How long it will take for the Gold pledge to be delivered to the PNU site ?
Import products of a company
CI-2009 MRc5:Regional Materialsposted by Katherine Aroca on
I have a question about it, please Can you tell me if the 500 miles are included for import products? I mean, in my company I have products that are import and we distribute that.
Plf3 Actual / Estimated Occupants
CS-2009 PIf3:Occupant and Usage Dataposted by Emmanuel Gee on
Hello, We are going C&S, but we know the occupants for one tenant and we are projecting the occupants for the other tenants, which is how we calculated WE1 and is based on the IBC 2009 Occupan
exhaust rate - garages
CS-2009 IEQp1:Minimum IAQ Performanceposted by Agnieszka Rylska on
ASHRAE 62.1-2007 requires specific exhaust rates for different space types in Table 6-4. For parking garages the requirement is 3.7 L/s/m2.