CI-2009 WEc1:Water Use Reductionposted by Katherine Ann Resurreccion on
Hi Would Sensor activated flush fixtures like urinals and WCs have the same flow rate calulations as a sensor type flow fixture? Would it follow the default 12sec / 60 cycle?
Not Regularly occupied
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Phillip Cook on
In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.
Car park in basement
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
If only four car parking spaces are located within the basement of the building, will they require separate exhaust even if they are not used regularly?
Late Start
Hospitality-NC-v4 IPc1:Integrative processposted by Annie Hwang on
We are in the final stages of completing construction documents for a new construction hotel. The owner recently expressed an interest in having the hotel LEED certified.
Upgrades
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Andres Giraldo on
Hi, If I did a narrative description about the HVAC at the begining of LEED project (PIf4), but know we have done some updates because of the level 1 audit, so do I need to change the HVAC narrativ
Bonus points?
NC-2009 MRc2:Construction Waste Managementposted by Craig Mahoney on
Hello, I work for a commercial waste hauler and C&D recycling facility. We have recently started recycling scrap drywall from new construction projects.
Can the project team purchase the RECs?
CI-2009 EAc4:Green Powerposted by Crista Shopis on
The reference guide states that "the tenant AND project team can purchase Green-e accredited RECs".
Increase total furniture cost with reused furniture value?
CI-2009 MRc5:Regional Materialsposted by Maria Porter on
We have an actual total furniture budget that we use when we calculate the percentages (20 or 10 % regional).
Environmental Labs in Office Building
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Victoria Bauer on
Hi, I am working on a LEED project in an office building that has environmental labs. Some of the labs have workstations to input data, but not a permanent desk for an occupant.
Non-potable water for sewage conveyance required for option 1?
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Valentin Grimaud on
Dear community, We have pursued this credit with option 1 and have achieved 52.31% only with the use of high efficiency WC and urinals.