Hi, If I did a narrative description about the HVAC at the begining of LEED project (PIf4), but know we have done some updates because of the level 1 audit, so do I need to change the HVAC narrative description, or I just need document those changes in order to show how Powerseal have been imrpoving and saving energy?
thanks.