Forum quick links
Pedestrian Access
NC-2009 SSc2:Development Density and Community Connectivityposted by Shannon Deeb on
Pedestrian access is defined in the reference guide as "Allows people to walk to services without being blocked by walls, freeways or other barriers." Are sidewalks and crosswalks required?
Type 1B Multi-family
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jeremy Kuhre on
Has anyone successfully pursued Option 2 Case 2 (blower door testing) for type 1B multi-family project?
Revolving doors
posted by Stephanie Graham on
I am helping our project team with a public building in Qatar under LEED-NC v2009. Main entry has a revolving door.
Data Center Energy Calculator Tool
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Jack Jenkins on
Does anybody have any experience with this new tool or know whether any further guidance on how it should be used is available? I have two questions in particular: 1) How is the baseline electrica
Addition Project Boundary remote from existing parking
Schools-NC-v4 MPR2:Must use reasonable LEED boundariesposted by Larry Turbes on
We are planning on certifying a school addition. The existing building is not certified and there will be a clear boundary between the addition and existing building.
Option 2: ASHRAE 90.1-2007 Section 11?
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Steve Gross on
Even though the credit language does not state it explicitly, I read "reduce design energy cost compared with the energy cost budget for regulated energy components" to mean "reduce the design ener
Humidity
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Gustavo De las Heras Izquierdo on
I was wondering if there is a minimum set of comfort parameters which HAVE TO be measured by the BAS.
Variable Frequency Drive / Frequency convertors
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Petra Hajná on
Hello everybody. I have a question: Is installation of fan motors with variable frequency drive in main AHUs an acceptable option of outdoor air measurement? I went through credit interpretations,
note about this forum
posted by Tristan Roberts on
Forum Moderator's Note: This forum is an older page on LEEDuser.
Water feature
CS-2009 WEc1:Water Efficient Landscapingposted by Heather Holdridge on
If there is a water feature in the landscape, that is counted within this credit, correct?