Pilot Credit 34 Update
Pilot-Credits PC34:Design for Adaptabilityposted by Sandy Chung on
Be sure to use the Updated version 8/1/2011. The required features are in line with the California Building Code Accessibility requirements.
US Standard VS European standard used (EAp2)
posted by Ian McCall on
Dear Tristan, Here is another question with regards to LEED certification struggles in Europe, more specifically with regards to EA prerequisite 2 mandatory provisions (sections 5.4, 6.4, 7.4, 8.4,
Subtracting built-in furniture/casework from square footage
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by American University on
We've had a designer tell us that built-in furniture and case work (like a fan-coil unit enclosure) can be deducted from the square footage of a room when calculating the window opening requirement
Site Lighting for Campus Plan
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
Hello, We have a campus application for our 3 mixed-use buildings. We are now on our final review and need to modify our submittal.
Help with table G3.1.1A,B
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
The project consists of non residential building of 6 stories.
Recertification - Changed Cleaning Contractors
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Greengrade User on
For a recertification, if the building management switches cleaning contractors partway through the performance period, and now completely different cleaning equipment is being used at the building
Blue Roof
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Jamison Hill on
As part of NYC's blue roof requirement, roofs must provide 24 hour detention detention for the 2-yr design storm and an equivalent peak runoff rate equal to a curve # of approx 50 for projects disc
Core and Shell minimum occupancy
NC-2009 MPR5:Must comply with minimum occupancy ratesposted by Vada Kornegay on
It seems clear but, to be certain, can a core and shell project have an occupancy of less than 50%?
Design Preliminary Review - change forms to In-Progress?
posted by Glen Phillips on
I have inherited multiple LEED registered projects, and it has been a while since I submitted anything for LEED.
What shell I do?
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Taygun Yüksel on
Hi there, I would like to ask a question about this credit scope. We have EBOM Coca Cola factory project in Turkey.