Pilot Credit 34 Update

Pilot-Credits PC34:Design for Adaptability
posted by  Sandy Chung  on 

Be sure to use the Updated version 8/1/2011. The required features are in line with the California Building Code Accessibility requirements.

0

US Standard VS European standard used (EAp2)

General forums
posted by  Ian McCall  on 

Dear Tristan, Here is another question with regards to LEED certification struggles in Europe, more specifically with regards to EA prerequisite 2 mandatory provisions (sections 5.4, 6.4, 7.4, 8.4,

0

Subtracting built-in furniture/casework from square footage

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  American University  on 

We've had a designer tell us that built-in furniture and case work (like a fan-coil unit enclosure) can be deducted from the square footage of a room when calculating the window opening requirement

1
Thu Jan 23, 2014, 9:28 pm

Site Lighting for Campus Plan

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

Hello, We have a campus application for our 3 mixed-use buildings. We are now on our final review and need to modify our submittal.

1
Fri Jan 24, 2014, 3:02 pm

Help with table G3.1.1A,B

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

The project consists of non residential building of 6 stories.

1
Fri Jan 24, 2014, 3:13 pm

Recertification - Changed Cleaning Contractors

EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipment
posted by  Greengrade User  on 

For a recertification, if the building management switches cleaning contractors partway through the performance period, and now completely different cleaning equipment is being used at the building

1
Thu Feb 6, 2014, 11:19 pm

Blue Roof

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Jamison Hill  on 

As part of NYC's blue roof requirement, roofs must provide 24 hour detention detention for the 2-yr design storm and an equivalent peak runoff rate equal to a curve # of approx 50 for projects disc

1
Thu Jan 23, 2014, 10:40 pm

Core and Shell minimum occupancy

NC-2009 MPR5:Must comply with minimum occupancy rates
posted by  Vada Kornegay  on 

It seems clear but, to be certain, can a core and shell project have an occupancy of less than 50%?

1
Fri Jan 24, 2014, 4:38 am

Design Preliminary Review - change forms to In-Progress?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Glen Phillips  on 

I have inherited multiple LEED registered projects, and it has been a while since I submitted anything for LEED.

1
Tue Feb 11, 2014, 8:35 pm

What shell I do?

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Taygun Yüksel  on 

Hi there, I would like to ask a question about this credit scope. We have EBOM Coca Cola factory project in Turkey.

1
Mon Jan 27, 2014, 2:26 am