Forum quick links
Pergola covering the mechanical equipment
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Alicja Bieszyńska on
The mechanical equipment located on the roof of my project is covered by a metal pergola/blinds only for the esthetics.
High Rise Building with 120+ AHUs
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Mark Daub on
Hi, Im working on a project in Germany that consists of two high rise buildings with 30 floors each. Each floor is devided into 2 Zones.
Compliance for the horizontal view at 42”
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Aditya Chemburkar on
For a CS Project, the tentative floor layout for the office space has been designed.
Solar service hot water system
NC-2009 EAp2:Minimum Energy Performanceposted by Rosana Correa on
Hi, The service water system in this building is heated by solar thermal collectors only, with no secondary heating system.
Expected Volume - Acceptable Estimates
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Lara Schneider on
What have you all determined to be an acceptable expected recycling volume estimate for this credit?
Submitting a new credit after final construction review
posted by Gaston Michaud on
Hello everyone, We just received the final construction review, and found out that our project got 59 points awarded.
Shortcut to VOC budget method
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Stantec BG+LU FW on
In the Bird's Eye View info, the "Shortcut to the VOC budget method" caught my attention under the "FAQs for IEQc4.2" section - this applies to me!
Matching IEQ c6.1 w/ IEQ c6.2
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Carrie Laurendine on
Im documenting these credits for an apartment/condo building.
LEED EBOM 2009 - EAP2
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by K A on
Hi, I work on a tenant building -- each unit has it's own electrical and water meters - no other utilities are used.
heating section type
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm modeling a baseline system according to System 5. I am considering Table 6.8.1A in order to determine the performance of the DX cooling coils.