Forum discussion

NC-2009 IEQc6.1:Controllability of Systems—Lighting

Matching IEQ c6.1 w/ IEQ c6.2

Im documenting these credits for an apartment/condo building. I understand that typically, the space on the form that shows the "total number of individual workspaces in project" must be teh same number on both forms c6.1 and c6.2). However, in an apartment, the "rules" change such that for 6.2 you only need one thermal control per unit. So on c6.1 im having to list total ROOMS, where on c6.2 im needing to list total UNITS. In other words, I have no idea how I can do this and have the total number figure match. Can someone please help me?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 09/23/2013 - 15:45

Michael- The current forms do not have residential-specific information. I suggest using the special circumstances section of the form for your project.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.