Forum quick links
Alternative Test Method for Blower Door Test.
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Haytham Mohamed on
We have a medium high-rise residential tower on Abu Dhabi, 4 apartments each floor, the return and supply for each flat are not connected with each others, the fire damper is located above the fals
Cleaner meeting SCAQMD Clean Air Solvent Certificate
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Sara Zoumbaris on
Hi, we have a project using a product that has not been certified by any of the LEED required third-party verifiers but has successfully met all requirements for the SCAQMD Clean Air Solvent Certif
Total Site Area Within the LEED Project Boundry
NC-2009 PIf2:Project Summary Detailsposted by James Wieben on
I have a project with a Lot area of 25,000 SF and a LEED Project Area of 31,000 SF due to sidewalk and landscape scope of work in the ROW.
LEED EBOM for Senior Care Facility?
posted by Jessica Hawley on
I have a client with a 3 year old senior care facility (includes both independent living and assisted living units).
Other Buildings On Site
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by John McLean on
I have a group of 5 existing buildings on a brownfield site, two are being reused and 3 are being demolished.
Campus parking division
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Sally Marr on
This question relates to both SSc4.3 and SSc4.4. I am working on a student union building for a college campus.
Truck parking for manufacturing plant
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Katherine Ann Resurreccion on
Hi, our manufacturing plant project has a lot of truck parking slots for unloading and loading of products.
LEED NC or EBOM?
posted by Daniela Margoni on
Hello, I have a client who has an office building and within two laboratories. They will have to redo the ventilation, heating and sanitary?
Base Building
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Keerthi Ratnayake on
Hi, What does it mean by "base building" in the credit language? Thanks in advance.
Ventilation and Energy Efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Keerthi Ratnayake on
Hi, We are designing a building for tropical climate condition and thinking of having natural ventilation and mechanical ventilation only. i.e.