Forum quick links
Sidestream filter?
Pilot-Credits WEpc17:Cooling tower water useposted by Jonathan Weiss on
The credit requirements do not call for a sidestream filter, but the documentation requirements list that we should confirm that a sidestream filter is being provided. Why is that?
Selling Energy instead of Purchasing
Schools-2009 EAc6:Green Powerposted by Greengrade User on
I'm working on net zero LEED Gold Middle School and I was wondering if it would be possible to get the points for this credit (and maybe more for exemplary performance) by selling excess on site re
Clarification: Portfolio Manager - Energy Audit
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Ashley Chiang on
Most University buildings are not eligible for Energy Star Ratings. Since P2 says that I need to conduct an "Energy Audit" isn't that covered in my P1 when I get an ASHRAE level 1 or 2?
General Usage Type
posted by Emmanuel Pauwels on
We have a C&S project that consists for 80% of office space and 20% service area.
Energy Star Logo
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Grace Ming on
In one of our project, the owner has purchased the Lenovo ThinkCentres for their office. In the specifications, it was mentioned that it is Energy Star and EPEAT Gold.
Night-Setback also in Baseline?
CS-2009 EAc1:Optimize Energy Performanceposted by Marco Abdallah on
THE BMS in our project is programmed with a night-setback function to reduce the temperature at NO operation (night) in winter for energy saving purpose. As the temperature setpoints have to be mod
Vegetated roof
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Katherine Ann Resurreccion on
If the project team plans to install vegetated roof, can they earn both credits (SSc5 and SSc7.2) provided the installation meets the required area for landscaping?
ASHRAE mandatory provision 5.4
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
Requirements according to ASHRAE mandatory provision 5.4: Cargo doors and loading dock doors shall be equipped with weather seals to restrict infiltration when vehicles are parked to doorway.
Tenant Lease Agreement Cases:
CS-2009 WEc3:Water Use Reductionposted by Diego Escalona on
Is possible, for a LEED CS project to apply for the three cases (A, B y C), that are expressed in the appendix 4: Tenant Lease Agreement. I.e.
Comingled Recycling
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Nate Ritter on
If a waste hauler servicing a building is offering comingled recycling off all office waste, including waste items that are non recyclable would the storage space on site still be required.