Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

V4 or V3 forms for 2009 Core and Shell...

General forums
posted by  shashank jain  on 

Hi we started the project with the Core and Shell... and we saw that the LEED has released V4 forms on the LEED online.. we should be using the V3 (the lEED that we were referring to) or V4...

1
Wed Jul 4, 2012, 6:52 pm

Blower Door Test Required?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Wei Jiang  on 

We have a high-rise hotel project with all guest rooms in the tower and hotel facalities (restaurants, meeting rooms, gym, etc.) in the podium.

1
Thu Jul 5, 2012, 2:40 pm

district CHP system

NC-2009 EAc1:Optimize Energy Performance
posted by  Giorgia Lorenzi  on 

I am modeling a building which is connected to a district CHP system.

1
Thu Jul 12, 2012, 6:57 pm

Offsite Landscape

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Irina Serrano  on 

I'm working on a project in Sao Paulo, Brazil and our project will implement a green area (1506.95 sf) outside our leed project boundary.

1
Sat Jul 14, 2012, 5:49 pm

Utilizing a Campus Shuttle to connect to Public Transit

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Eamon Geary  on 

For a military base project, the facility is connected to a campus shuttle with 20+ stops.

1
Thu Jul 5, 2012, 8:03 pm

Historical uses

Pilot-Credits SSpc16:Rainwater management
posted by  nancy Charron  on 

I have a urban site project that has had 2 prior buildings before this one. The most recent prior historical use was all impervious surfaces.

1
Tue Sep 4, 2012, 8:37 pm

Building Flush Out - Chilled Beams / Radiant Cooling

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Nandana Kumar  on 

We have couple of projects where the HVAC system is being served by Chilled Beams and Radiant Cooling.

1
Fri Jul 6, 2012, 3:34 pm

Janitor Closets in the Base Building

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Julie Hendricks  on 

We have existing janitor closets in the base building that are on and serve the tenant floors we are building out.

1
Sat Sep 1, 2012, 8:10 pm

District Cooling system and energy modeling(visualDOE)

NC-2009 EAp2:Minimum Energy Performance
posted by  Mohamed Ravuthar, LEED AP, BD+C  on 

How to handle District Cooling system into energy modeling(visualDOE). 1.Is it required to do energy modeling for District Cooling system for LEED?

1
Sat Jul 7, 2012, 3:18 pm

Unitary Cooling Efficiencies

NC-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

Hello, We are simulating a type 4 system in our baseline and need to know if the efficiency ratings specified in table 6.8.1B (and tables 6.8.1.A, 6.8.1D) do include supply fan power and hence ne

1
Tue Jul 10, 2012, 1:34 pm