We have couple of projects where the HVAC system is being served by Chilled Beams and Radiant Cooling. I would like to know is there any specific method for carrying out building flush out with 100% DOS system.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Dylan Connelly
Mechanical EngineerIntegral Group
LEEDuser Expert
472 thumbs up
July 6, 2012 - 11:34 am
There is no specific different method for going about a building flush out with 100% DOS. The only caveat is that typically a DOS system is between 20-50% of the size of a typically VAV system with min OA that would serve the same size project. As a result you may need to schedule more time in the construction schedule to finish the flush out over a typically VAV system capable of economizer. If the construction schedule is tight you can bring in temporary supplemental fans to speed up the flush out.