I am modeling a building which is connected to a district CHP system. I’m using LEED 2009 NC Italia, which refers to “CHP Calculation Methodology for LEED-NC v2.2 EA Credit 1”
http://www.usgbc.org/ShowFile.aspx?DocumentID=1354
where it is written “The Baseline Building heating and cooling plant utilizes the backup energy source(s) of the Design, or electricity if no backup source is present”.
I'm modeling a project with no backup source (heating is due only to the district heating and to solar collectors and no cooling system is present).
For the heating system shall I model electrical resistances? To calculate the primary energy shall I use the conversion factor relative to electric energy (according to Italian standards 2,17)? And for the cooling system can I choose any system which uses electrical energy as input and the limit value of ASHRAE 90.1 as efficiency?