Forum quick links
ACP Process : BREEAM equivalency
posted by CHRISTOPHE MATHIEU on
Could anyone let me know if USGBC released any extra information on the process to effectively use the BREEAM calculations for LEED energy credits...? The USGBC documentation and the online applic
Parking Capacity
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by VITAL DAFNE on
I am working on a hotel with two separate buildings. Since the parking will be used for the same hotel, the local zoning requirements were met.
Natural Ventilation Form Filling
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Levey on
Hi everyone, We have a residential project which has around 600 rooms naturally ventilated. I've prepared an excel sheet to demonstrate compliance with natural ventilation requirements.
Splitting credit for renewable energy to 2 different buildings?
NC-2009 EAc2:On-Site Renewable Energyposted by Renee Shirey on
We have a few schools from the same district being built at the same time, and we are considering adding PV to some/all of them.
Demoltion before possession
NC-2009 MRc2:Construction Waste Managementposted by Pamela Lippe on
If demolition is done by a landlord before a tenant has taken possession, does it have to be included in the calculations for LEED CI?.
Tenant storage vs Host Building storage.
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Luis Leal on
We separate the waste in 3 in the tenant space: organic, paper and recyclables.
WEp1 Retail NC – Process Water
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Maria Porter on
Hi, I need help with my first process water calculation. On LEED Online: What does “ADO” mean? Could it be “Annual Days of Operation” maybe?
Case 2
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by AAME User on
If the 62MZ calculator reveals that the critical zone is a zone with cooling only (with a min of 0), is that an appropriate reason to pursue Case 2?
About Table 1.Standard VOC Limits
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Albert Sagrera on
Hi, about the table 1. Standard VOC Limits, which values we might use, Ceiling Limit or Effective Date? Thank you,
Prescriptive approach - adjusting VLT for an overhang
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ramana Koti on
Greetings all. One one of our LEED projects, we're using the prescriptive approach of VLT*WFR falling within the range of 0.15 and 0.18.