Topic | Recent |
---|---|
LIghts pointing upwardsEBOM-v4 SSc4: Light Pollution Reductionposted by David Lazaro on Mar 23, 2017, 11:28 am
Hello, We have a very singular high-rise Project in the city centre. The light levels around the whole boundary are quite high, so we are thinking about pursuing Option 2 because the... Last reply: Bill Swanson, Jun 9, 2017, 11:47 am |
|
GlisofatEBOM-v4 SSc5: Site managementposted by Emmanuel Pauwels on Jun 5, 2017, 3:29 pm
There are contradictory studies related to the use of glisofat as a herbicide. Would spraying with a mixture containing 30% glifosat be an aceptable practice? Last reply: Trista Brown, Jun 6, 2017, 11:22 am |
|
IBR, Institut für Baubiologie in RosenheimNC-v4 EQc2: Low-emitting materialsposted by Emmanuel Pauwels on May 5, 2017, 4:11 am
Can we consider the IBR (Institut für Baubiologie in Rosenheim) an approved seal which is compliance with LEED v4 requirement for... Last reply: Reinhard Oppl, May 18, 2017, 5:56 am |
|
Solvent Cement Adhesive for PVC pipesNC-v4 EQc2: Low-emitting materialsposted by Emmanuel Pauwels on May 9, 2017, 8:24 am
We are trying to find a specific adhesive for PVC pipes. It should be a "Medium Bodied Rigid PVC Solvent cement for large diameters and elevated temperatures (>35°C)" Has anyone... Last reply: Scott Steady, May 9, 2017, 12:18 pm |
|
ID+C v4- Existing Office Building: Lighitng & EnvelopeCI-2009 EAp2: Minimum Energy Performanceposted by Marc Maso on Apr 12, 2017, 10:00 am
We are doing a ID+C in a existing building, where the lighting and the envelope are the original ones. We doesn't modified this items. The original lighting (W/ft2) is better than the... Last reply: Marcus Sheffer, May 1, 2017, 10:04 am |
|
Indoor plants planted in the groundNC-2009 SSc5.1: Site development - protect or restore habitatposted by Albert Sagrera on Apr 10, 2017, 12:10 pm
Good afternoon, Last reply: April Brown, Apr 27, 2017, 1:50 pm |
|
Lots and open space questionNC-2009 SSc5.2: Site development - maximize open spaceposted by Albert Sagrera on Apr 3, 2017, 11:17 am
Hello, We are wondering if a future building occupying two different plots can be In the case that it is considered as a single... Last reply: Allison Smith, Apr 3, 2017, 11:45 am |
|
LCA calculationNC-v4 MRc1: Building life-cycle impact reductionposted by Emmanuel Pauwels on Mar 23, 2017, 2:10 pm
1- When performing a LCA calculation for the envelope and... Last reply: Panu Pasanen, Mar 27, 2017, 9:21 am |
|
Daylight and quality views measurement in a special buildingEBOM-v4 EQc5: Daylight and quality viewsposted by Ana Villarroya on Mar 13, 2017, 5:39 am
We're working on a case of a building complex that aims to achieve a LEED certification within some years. The complex is a sanctuary, and it includes several hospitality buildings and a shrine.... Last reply: TODD REED, Mar 13, 2017, 7:53 am |
|
FTE is linked to IEQc6.1 and IEQc6.2- Healthcare buildingsNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by VICTOR MORENO on Apr 6, 2016, 5:47 am
In our Healthcare project, there are different workers during the morning, afternoon and evening, with a time of 8 hours each. If I count the... Last reply: Ben Stanley, Mar 8, 2017, 7:10 pm |