EA Prerequisite 2CI-2009 EAp2: Minimum Energy Performanceposted by Poorva Keskar on Feb 19, 2016, 1:37 am
In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope. Please suggest the compliance... Last reply: Marcus Sheffer, Feb 19, 2016, 11:10 am |
|
Pump Room, STP Room & Guard Room Within LEED BoundaryHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Aswin M on Dec 31, 2015, 4:54 am
We have a factory project to be registered under LEED New Construction. The project has a Main building and additionally Pump room, STP room and a guard room which serves the need of the Main... Last reply: Aswin M, Feb 5, 2016, 4:41 am |
|
EA Cr 1.5Retail-CI-v2009 EAc1.5: Optimize energy performance - building envelopeposted by balasubramaniam kg on Jan 29, 2016, 12:42 am
We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas. |
|
Idle energy rate for energy star equivalency calculationsCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Shuchita Gupta on Jan 20, 2016, 8:30 am
Hi , We have an interior project specifying kitchen appliances like electric fryer , which are not energy star labelled so we are checking the equivalency for which we require idle rate... Last reply: Shuchita Gupta, Jan 26, 2016, 8:09 am |
|
Method to Achieve Thermal- Comfort for Ventilated AreaNC-2009 IEQc7.1: Thermal comfort - designposted by SAMY Chamy on Aug 31, 2015, 4:15 am
Hai Everyone:- Our project is sewing factory It is not fully conditioned (A/C & Ventilation) 1.A/c for Office area Last reply: Christopher Schaffner, Jan 25, 2016, 10:44 am |
|
Construction Activity and Pollution PreventionNC-2009 SSp1: Construction Activity Pollution Preventionposted by JP Rout on Jan 22, 2016, 1:28 am
We have Project intending to be registered under LEED 2009 BD+C for major renovations. This is an existing building which will undergo major renovation work for the interiors, HVAC and a large... Last reply: JP Rout, Jan 25, 2016, 4:13 am |
|
Need Registration guidance for an upcoming Hospital campusLEED Guidance for Campuses and Multiple Buildingsposted by Neha Singhal on Jan 14, 2016, 9:16 am
We have a Medical institution coming up at Faridabad (India), which contains various types of building, where the construction would be carried out simultaneously for all the blocks. The site... Last reply: Jon Clifford, Jan 17, 2016, 11:51 am |
|
Water Consumption Outside LEED BoundaryNC-2009 WEp1: Water Use Reductionposted by Aswin M on Dec 24, 2015, 4:06 am
We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women). Last reply: Melissa Merryweather, Jan 3, 2016, 11:52 pm |
|
Single Building Certification_LEED New Construction 2009NC-2009 MPR2: Must be a complete, permanent building or spaceposted by Aswin M on Dec 23, 2015, 5:42 am
We have a Garment factory project that has three blocks with connectivity bridge. Last reply: Jon Clifford, Dec 30, 2015, 12:06 am |
|
WE Credit 4.2: Cooling Tower Water Management- non potableEBOM-2009 WEc4: Cooling Tower Water Managementposted by satheesh M on Nov 26, 2015, 3:51 am
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned... Last reply: Ben Stanley, Dec 1, 2015, 11:07 am |