Forum quick links
Environmental Product Declarations
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Debra Sypien on
Does anyone know what type of documentation will come from an EPD? Will they all need a certificate? What type of questions will we need to ask subcontractors/manufacturers
ID#100002123
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Agnieszka Rylska on
Hello,
How to model glycol used for freeze protection in hydronic systems, i.e., not ice storage?
NC-v4 EAp2:Minimum energy performanceposted by Jamy Bacchus on
If a proposed chiller (or boiler) meets the Tables 6.8.1A-J in 2007 or 2010, when tested with water at AHRI conditions but is designed to be used with glycol for freeze protection, then its actual
Outdoor Air delivery monitoring
NC-v4 EQp1:Minimum indoor air quality performanceposted by Manikandan S on
Hi All,
Calculate reclaimed water in "Indoor Water Use Reduction Calculator"
NC-v4 WEc2:Indoor water use reductionposted by Hanh Truong on
Dear all,
EPD of Products/Materials
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ann E on
We are in our process of gathering and submitting our papers for LEED requirements but we our having a trouble regarding the EPD since none of our suppliers have a certification on hand.
LEEDv4 CI Office space - VRF software to calculate fan energy
CI-v4 EAc3:Advanced energy meteringposted by Jane Christen on
We have a LEEDv4 CI Commercial Office space where in addition to those already metered, lighting, plug, etc., the other end uses are heating, cooling, and fan energy.
Prefererd parking spaces in Valet Parking - Hotel project
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Arub Vijay on
I have a hotel building project with 145 parking (Valet parking) which is less than the authority requirements of 165.
Extended Producer Responsibility - documentation
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Tristan Roberts on
Has anyone pursued this credit using Extended Producer Responsibility? Did you find that you had to meet any specific documentation requirements?
ISO 50001 ACP
EBOM-v4 EAp1:Energy efficient best management practicesposted by veronica oyarzun on
For LEED EBOM 2009 there are ACP´s available through the ISO 50.001. How does it works for v.4?