Building with the skyway
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Elżbieta Pawlak on
The Project is composed of 2 separate buildings connected together with 2 floors of underground garage and 8 floors of skyway.
"Planned Method for gathering feedback on Occupant Satisfaction"?
CI-v4 IPc1:Integrative processposted by Kathleen Sandberg on
What criteria do we have to include in our survey? Is there a requirement for timing, frequency, etc?
EnergyPro DOE-2 Output Report: system and plant throttling range %
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi all,
Decreasing Baseline Capacities for Unmet Load hours
NC-2009 EAp2:Minimum Energy Performanceposted by F S on
Hi All,
My question is basically about how much can you decrease the baseline capacities without going to far - that might call Red flags.
Minimum efficiencies for VRF with heat pump system
NC-v4 EAp2:Minimum energy performanceposted by Instra Ingenieros on
Hi there, I have a question regarding VRF efficiencies. We have an office building that have VRF with heat pump systems that provide cooling and heating.
Language of submission
posted by MAUDE PINTAL on
Hi,
We are in Quebec (Canada), and we are wondering if we can submit the LEED ND in Frensh ?
Thank you
Innovation - Bird Collision Deterrence
NC-v4 INc1:Innovationposted by Geoffrey Katz on
For the Pilot Credit Bird Collision Deterrence one requirement is to "Develop a three-year post-construction monitoring plan to routinely monitor the effectiveness of the building and sit
Excluding Kitchens and other F&B spaces within a stadium from Quality Views
NC-v4 EQc8:Quality viewsposted by Quentin Jackson on
Hi there,
IEQc8.2 Obstructed view clarification (Column with sightline)
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Chad Thurlow on
Hello
Fan demand output is less than Fan power input
NC-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi LEED experts,