Forum quick links
Guide Language
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by PAWAN DAHIWAL on
Under several material credits its mentioned that "Procure 20 different permanently installed item from 5 different manufacturer"...for EPD/CSR My question is, 1) To meet the requirement under th
Convincing your MEPs to stop worrying and love higher ventilation rates?
posted by Z Smith on
The results from the "CogFx" study are compelling, showing that people in environments with low VOCs and low ambient CO2 levels score higher on
Minimum 18% energy saving after April 2016 - Scoring
NC-2009 EAc1:Optimize Energy Performanceposted by Eric Claycamp on
My project will likely reach 20% to 23% Energy Savings. Does this mean I can only score the points after I meet the minimum? In other words is a 20 percent reduction only one credit point?
Material Reuse
NC-v4 MRc5:Construction and demolition waste managementposted by SAMY Chamy on
Dear Concern:-
Break Rooms
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Bill Swanson on
I see that this has been asked before and there have been LEED Interpretations (10263) on this topic. But I think they are wrong. Specifically the ruling that says, "Note that only
IEQ 3.2 NC-V2009
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Peter Del Sette, Jr on
Meeting ASHRAE 90.1 COP Requirement in Proposed Case Energy Simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Sasha Peters on
We recently received a comment from USGBC LEED that we have to meet ASHRAE 90.1 COP requirement in proposed case energy simulation as well.
Different GPF for two WC's in same fixture group
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Razan Nejem on
In an office building the the public restrooms have two kinds of Dual Flush WC's with different gpf, one WC has 0.79 gpf and the other one has 0.82 gpf.
Carpark surfaces
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Ekin Caglar Gokbas on
Hi everybody. I have a problem in the project which i am leading the LEED certification. We have parking areas inside of the building basement floor.
Ground level surface with underground spaces below
NC-v4 SSc5:Heat island reductionposted by Ricardo Sá on
An area located at ground level that has a parking garage below (underground) should be considered landscape/hardscape or roof?