Retrofit of a existing building into green building

EBOM-2009 WEc1:Water Performance Measurement
posted by  Mohammed Ibrahim  on 
How i can calculate the use of water in a college building?
6
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Jan 10, 2018, 5:45 pm

Storm water from neighboring site

NC-v4 SSc4:Rainwater management
posted by  Bradley Magnusson  on 

The project I am working on is in a campus setting and the neighboring site's excess runoff is discharged into a storm drain pipe that runs through our project's

1
Wed Jan 10, 2018, 6:01 pm

NC-v4 SSc2 - Site development - protect or restore habitat

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Mar Mulero  on 

Hello :an outside area of land with vegetation, but where lighting has been installed and dirt roads have been formed, long time ago, it can be considered a greenfield area or previously disturbed?

1
Thu Jan 11, 2018, 11:54 pm

Production plant - LEED system selection

LEED Rating System Selection
posted by  Agnieszka Rylska  on 

What is the most appropriate LEED system for a new production plant? Can we register the project under LEED for Warehouses and Distribution Centers?

3
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed Jan 10, 2018, 3:45 pm

Threat Factor Calculation

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Francesco Passerini  on 

Hi I've been working on a project where I want to purse this pilot credit.

1
Thu Jan 11, 2018, 2:52 pm

Monitoring-based commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  Paula Rantanen  on 

In our project building, we have many measurement points that do not measure energy consumption directly but the energy consumption can be reliably calculated from the tracked data and the building

1
Wed Jan 10, 2018, 3:22 pm
1
Wed Jan 10, 2018, 2:37 pm

Which flow rates to use?

NC-v4 WEp2:Indoor water use reduction
posted by  Nate Tsang  on 

Hi all, The prerequisite lists the baseline flow rates at 60psi (415 kPa). Does this mean that the proposed flow rate must also be at 60psi?

5
Sustainability Consultant
Stantec
LEEDuser Premium Member
13 thumbs up
Wed Jan 10, 2018, 2:20 am