Forum quick links
Two Phase Renovation - Two phases of testing possible?
CI-v4 EQc4:Indoor air quality assessmentposted by Katherine Roth on
The commercial interiors project includes the renovation of an office space in two phases. 1/2 of the tenant space will be renovated in Phase I.
IEQc6.1 Regularly Occupied Definition and IEQc8.2 Definition
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Danielle Dunn on
I am working on a project that is pursuing both credits IEQc6.1 using Case 1 and IEQc8.2.
Space Usage Calculator and Submitting as a Group Project
Schools-2009 PIf3:Occupant and Usage Dataposted by Danielle Dunn on
Hello,
Preferred Parking Location
NC-v4 LTc8:Green vehiclesposted by Michelle Rosenberger on
Previous rating systems required preferred spaces to be located closest to the primary entrance exclusive of ADA and though the two examples in the reference manual depict that kind of scenario the
Outside airflow rates
CI-v4 EAp2:Minimum energy performanceposted by Juan Carlos Sanabria Fallas on
Hi I receive this comment of the reviewers:
Social Housing
ND-Plan-v4 NPDc4:Housing types and affordabilityposted by Stephani Carter on
Hello, does anyone know if social housing can be counted as "affordable housing" for this credit?
LEED V4 - Retail Vs Core&Shell
posted by Ricardo Sá on
Dear All,
We are currently working with a client that is developing a project that includes:
Water Coil Sizing, heating and cooling
NC-v4 EAp2:Minimum energy performanceposted by Giuseppina Amorusi on
Hi all! I have a problem with water coil sizing. I set the following parameters for cooling and heating:
Post occupancy assesment
NC-v4 EQc4:Indoor air quality assessmentposted by eran ben kennaz on
I was asked by the client to collect air samples now- a month after occupancy (he says he forgot to call me before.......). Would that be acceptable when they send in the reports?