Topic | Recent |
---|---|
Historical designation and infill site calculationNC-v4 LTc3: High priority siteposted by Jacopo Cattaruzzi on Oct 21, 2024, 9:17 am
Hi, I am following a project of a hotel complex located in the Italian alps. It will be certificated as an aggregate of major renovation and new built additions using the... Last reply: Jacopo Cattaruzzi, Oct 23, 2024, 3:41 am |
|
Visitor Parking in Multi-Tenant BuildingsCI-v4.1 LTc4: Bicycle facilitiesposted by Tim Bush on Sep 4, 2020, 3:55 am
As an interior fitout in a multi-tenant building, I've always assumed it's reasonable under LEED to pro-rata the number of whole building long-term bicycle parks and showers based on... Last reply: Andrey Kuznetsov, Oct 23, 2024, 2:15 am |
|
Reasonable assumption for plenum ceilingEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Omar Elrawy on Oct 14, 2024, 4:53 am
We have old existing office building where ducted FCU is serving all the spaces. Fresh air is dumped to the plenum (no ducts), likewise for return air, so mixing happen randomly within the... Last reply: Andrey Kuznetsov, Oct 23, 2024, 2:12 am |
|
Flush-out in phasesCI-v4 EQc4: Indoor air quality assessmentposted by Roshni Mathur on Oct 12, 2024, 10:08 am
We are working on a project wherein the interior fit-out work will be carried out in 2 phases. Consequtively the occupancy will be in 2 phases aswell. The project proposes to complete the... Last reply: Andrey Kuznetsov, Oct 23, 2024, 2:09 am |
|
Detaining the rainwater runoff-an accepted solution?NC-v4 SSc4: Rainwater managementposted by Florian Schmidtchen on Dec 8, 2016, 6:13 am
Dear all, Last reply: Andrey Kuznetsov, Oct 23, 2024, 1:59 am |
|
Last chance to comment on LEED v5LEED v5 BD+C/ID+C: Overall and Appendix 2nd Public Commentposted by Nadav Malin on Sep 27, 2024, 9:53 am
Weigh in on the second public comment draft of LEED v5 here. You can reply to this thread or use the "Post a Question/Comment" button to start a new thread. The... Last reply: Harry Flamm, Oct 22, 2024, 9:32 pm |
|
Testing Protocol and Training RequirementsPilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Glen Boldt on Oct 22, 2024, 8:39 pm
Cleanliness Protocols: Wondering if there has been any pushback from Operators/Facility staff on these protocols and the training requirements? |
|
How to calculate EFLH in a Minimum calcuratorRetail-CI-v4 EAp2: Minimum Energy Performanceposted by on Oct 22, 2024, 2:21 am
Dear all, We’re currently simulating for only one store area in a department building pursuing LEED v4 Certification. The project has received the following observations from... Last reply: Iqbal Khalilullah, Oct 22, 2024, 7:27 pm |
|
EQc Low Emitting Materials- butyl sealant that meets requirementsNC-v4 EQc2: Low-emitting materialsposted by Theresa Lehman on Oct 21, 2024, 5:07 pm
The subcontractor supplying the commercial kitchen equipment for a project included a sealant (Premier XtraBond 1500NS) in their submittal that is not compliant with the LEED EQc Low-Emitting... Last reply: Kimberly Lombardozzi, Oct 22, 2024, 2:12 pm |
|
Fire alarm cables (Public Address system) in the hospitalsHealthcare-v4 MRc6: PBT source reduction - lead, cadmium and copperposted by Najam Us Saqib on Apr 7, 2022, 2:54 am
Fire alarm cables are same like electrical cables, however, its function is different. The v4 LEED guide uses the words ''Electrical wiring and cabling'' under Lead requirements (... Last reply: Michelle Bombeck, Oct 22, 2024, 11:52 am |