Log in
Forum
Topic

Historical designation and infill site calculation

NC-v4 LTc3: High priority site
posted by Jacopo Cattaruzzi on Oct 21, 2024, 9:17 am

Hi,

I am following a project of a hotel complex located in the Italian alps. It will be certificated as an aggregate of major renovation and new built additions using the...

Last reply: Jacopo Cattaruzzi, Oct 23, 2024, 3:41 am

Visitor Parking in Multi-Tenant Buildings

CI-v4.1 LTc4: Bicycle facilities
posted by Tim Bush on Sep 4, 2020, 3:55 am

As an interior fitout in a multi-tenant building, I've always assumed it's reasonable under LEED to pro-rata the number of whole building long-term bicycle parks and showers based on...

Last reply: Andrey Kuznetsov, Oct 23, 2024, 2:15 am

Reasonable assumption for plenum ceiling

EBOM-v4.1 EQp1: Minimum Indoor Air Quality
posted by Omar Elrawy on Oct 14, 2024, 4:53 am

We have old existing office building where ducted FCU is serving all the spaces. Fresh air is dumped to the plenum (no ducts), likewise for return air, so mixing happen randomly within the...

Last reply: Andrey Kuznetsov, Oct 23, 2024, 2:12 am

Flush-out in phases

CI-v4 EQc4: Indoor air quality assessment
posted by Roshni Mathur on Oct 12, 2024, 10:08 am

We are working on a project wherein the interior fit-out work will be carried out in 2 phases. Consequtively the occupancy will  be in 2 phases aswell.

The project proposes to complete the...

Last reply: Andrey Kuznetsov, Oct 23, 2024, 2:09 am

Detaining the rainwater runoff-an accepted solution?

NC-v4 SSc4: Rainwater management
posted by Florian Schmidtchen on Dec 8, 2016, 6:13 am

Dear all,
In our project we are planning to follow option 1 path 2. Therefor we provide underground-trench systems and a technical ditch on our project site, which gets inserted creatively...

Last reply: Andrey Kuznetsov, Oct 23, 2024, 1:59 am

Last chance to comment on LEED v5

LEED v5 BD+C/ID+C: Overall and Appendix 2nd Public Comment
posted by Nadav Malin on Sep 27, 2024, 9:53 am

Weigh in on the second public comment draft of LEED v5 here. You can reply to this thread or use the "Post a Question/Comment" button to start a new thread.

The...

Last reply: Harry Flamm, Oct 22, 2024, 9:32 pm

Testing Protocol and Training Requirements

Pilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogens
posted by Glen Boldt on Oct 22, 2024, 8:39 pm

Cleanliness Protocols:  Wondering if there has been any pushback from Operators/Facility staff on these protocols and the training requirements?  

How to calculate EFLH in a Minimum calcurator

Retail-CI-v4 EAp2: Minimum Energy Performance
posted by on Oct 22, 2024, 2:21 am

Dear all,

We’re currently simulating for only one store area in a department building pursuing LEED v4 Certification. 

The project has received the following observations from...

Last reply: Iqbal Khalilullah, Oct 22, 2024, 7:27 pm

EQc Low Emitting Materials- butyl sealant that meets requirements

NC-v4 EQc2: Low-emitting materials
posted by Theresa Lehman on Oct 21, 2024, 5:07 pm

The subcontractor supplying the commercial kitchen equipment for a project included a sealant (Premier XtraBond 1500NS) in their submittal that is not compliant with the LEED EQc Low-Emitting...

Last reply: Kimberly Lombardozzi, Oct 22, 2024, 2:12 pm

Fire alarm cables (Public Address system) in the hospitals

Healthcare-v4 MRc6: PBT source reduction - lead, cadmium and copper
posted by Najam Us Saqib on Apr 7, 2022, 2:54 am

Fire alarm cables are same like electrical cables, however, its function is different. The v4 LEED guide uses the words ''Electrical wiring and cabling'' under Lead requirements (...

Last reply: Michelle Bombeck, Oct 22, 2024, 11:52 am