Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent
3
President
C-Wise Design and Consulting
LEEDuser Premium Member
70 thumbs up
Mon Sep 16, 2019, 2:38 pm

Phased project implementation

NC-2009 EAc5:Measurement and Verification
posted by  Tim Murray  on 

We have a phased higher education project in which a new building addition will be built first, then the existing buildings will be renovated and open a year later.

1
Sun Sep 15, 2019, 9:47 pm

Service Water Heating DHW flow rate in the v4 Minimum Energy Performance Calculator

NC-v4 EAp2:Minimum energy performance
posted by     on 

We are working on a large hotel, and are concerned with the "Modeled DHW Flow Rate gallons/minute" results we are getting from the "Service Water Heating" portion of the calculator.  We've dou

2
Sustainability Enabler
Eskew+Dumez+Ripple
LEEDuser Basic Member
20 thumbs up
Thu Sep 12, 2019, 7:50 pm

IPM Tracking Tool

EBOM-v4 EQc9:Integrated pest management
posted by  Catalyst Partners  on 

The form requires teams to upload a "IPM Tracking Tool" which is not available on USGBC LEED Credit resources page or here on LEEDuser. Anyone know what it looks like or have it?

6
Thu Sep 12, 2019, 5:44 pm

Concrete bonding agent below slab on grade

NC-v4 EQc2:Low emitting materials
posted by  Vandita Mudgal  on 

We have to use a strong concrete bonding agent below a 2 to 3" Slab on grade to stick with the concrete foundation below the structure.

9
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Wed Sep 11, 2019, 5:21 pm

Pilot Credit Requirment

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Maria Fiorelli  on 

I recently pursued this credit for a LEED v4 ID+C office space. It appears as though the credit documentation was approved; although, none of the three products have full documentation.

4
Tue Sep 10, 2019, 7:18 pm

Indoor Water Use Reduction and Water Sense

NC-v4 WEc2:Indoor water use reduction
posted by  Jason Garvens  on 

On pg. 297 of the LEED v4 BD&C Reference Guide it states the general credit requirements but makes no mention of WaterSense labels being required there. However on pg.

3
Tue Sep 10, 2019, 5:49 pm

Sound Transmission - Open Office Adjacency

CI-v4.1 EQc9:Acoustic Performance
posted by  Tyler Cottrell  on 

How are Open Plan Office areas classified in terms of the Sound Transmission section?

1
Tue Sep 17, 2019, 9:35 pm

Plywood Blocking

CI-v4.1 EQc2:Low Emitting Materials
posted by  Allen Cornett  on 

Is plywood blocking in the wall part of the Wall Panel category or the Composite Wood category?  It is not specifically address or excluded in the Wall Panel category, and I could ma

0