Hello!  I am working on a project with on-site PV.  When calculating the Green Power offset, do we need to offset the total modeled electricity usage BEFORE or AFTER subtracting the electricity generated from the PV?  It's a rather large array (77% of total modeled elec usage), so the cost differential would be high.  Thanks!