Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Site Area Question

NC-v4.1 SSc5:Heat Island Reduction
posted by  Catherine Blakemore  on 

I noticed in the LEEDuser commentary that the credit calculations need to include parking outside the LEED project boundary.  Does this addition area get added to the area to of the LE

1
Tue Feb 11, 2020, 6:34 pm

Minimum IAQ performance LEED CI v4

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Donna Juselis  on 

Credit states "Monitoring Mechanically ventilated spaces For mechanically ventilated spaces (and for mixed-mode systems when the mechanical ventilation is activated), monitor outdoor air intake fl

2
Head of Energy & Environmental Management
EB Project Management | Green Building Consultants
LEEDuser Basic Member
14 thumbs up
Tue Feb 11, 2020, 8:40 am

pursuing Renewable Energy and Green Power with the v4.1 credit substitution path

NC-v4 EAc5:Renewable energy production
posted by  Cindy Quinn  on 

I am working on a v4 project that is about to submit for final construction review.  We must reach Gold and are right on the threshold, going in with 62 points, if all are earned.  We don

1
Fri Feb 7, 2020, 7:02 pm

Exterior walk-off mats permitted?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Vince Briones  on 

Hi- has anyone gotten verification on whether exterior walk off mats are permitted under v4? The reference guide and current addenda are silent on that detail.

2
Senior Sustainability Manager
WSP
LEEDuser Expert
53 thumbs up
Thu Feb 6, 2020, 1:36 pm

Green Infrastructure Stormwater Reuse

NC-v4 SSc4:Rainwater management
posted by  Patrick Murphy  on 

The definitions of green infrastructure and low impact development strategies appear to exclude capturing roof rainwater for reuse within the building for toilet flushing, irrigation, cooling tower

4
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Feb 5, 2020, 9:56 am

Good Pilot Credit - Adopt Strategies Early

Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environment
posted by  Leina Naversen  on 

I recommend pursuing this pilot credit as an innovation point on any project.  It's great to be able to incorporate biophilic design strategies into projects.  Teams considering pursuing

2
Manager
CTE - Centro de Tecnologia de Edificações
LEEDuser Basic Member
80 thumbs up
Tue Feb 4, 2020, 6:08 pm

MR Actual Cost Calculation vs. recycled and regional material cost that can be put in the numerator

NC-2009 MRc5:Regional Materials
posted by  Jeff Wiedmeyer  on 

Can anyone say with certainty that projects seek LEED v2009 MR credits must include the costs for Div.

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Sun Feb 2, 2020, 5:30 pm

Fire Station Baseline System

NC-v4 EAc2:Optimize energy performance
posted by  Jennifer Luce  on 

I understand fire station has residential spaces.  Under 90.1, it requires residential to use PTAC #1 for system type.  Due to having gas available, is it correct to model the baseline sy

1
Wed Feb 5, 2020, 7:46 pm

EVSE - ISO 15118 compliance

NC-v4.1 LTc8:Electric Vehicles
posted by  Mike Cavanaugh  on 

I'm looking into substituting this credit and pursuing option 1 (2% of spaces) but have a question about the third criteria for EVSE - Vehicle to Grid (ISO 15118) compliance.  I've r

21
Sustainable Design Director
Boulder Associates Architects
LEEDuser Premium Member
20 thumbs up
Wed Jan 29, 2020, 8:36 pm
6
Wed Jan 29, 2020, 5:46 pm