Hi - Our solar PV system is adding two points to our "optimize energy performance" category due to the cost offset. Can I also claim additional points for renewable energy production based on the % of total energy(costs) my solar array is producing? In our case, this will total 3 points in the renewable energy production category, plus 1 additional regional priority point. I want to be sure I can claim all 6 of these points and that this not considered double-dipping by LEED. Thank you.