Light Trespass and facade treatment
NC-v4 SSc6:Light pollution reductionposted by Deb Favaretto on
We have a project with a backlit perforated super-graphic mounted to the face of the exterior wall. Would this feature be exempt from Light Trespass as a façade treatment if we have an automa
Crystalline Waterproofing in Elevator Shaft
NC-v4 EQc2:Low emitting materialsposted by Elizabeth Kertesz on
Our project team is trying to identify a crystalline waterproofing product that will be applied in the elevator shaft, but it doesn't appear that there are any crystalline waterproofing products th
Overhead Vegetated Canopy
NC-v4 SSc3:Open spaceposted by Nita Christopher on
We have a campus site site with areas, outside of construction limits, that contain many mature shade trees with turf grass underneath.
LT 6 Bicycle Longterm and Shortterm v4 or v4.1 indoors?
NC-v4.1 LTc6:Bicycle Facilitiesposted by sandra DOLD on
PLease confirm if we upgrade to LEED v4.1 there is no requirement for indoor bike storage facilities for either long or short term biking. My understanding the shorterm needs to be within 100
Aircraft collision avoidance lighting in highrise buildings
EBOM-v4 SSc4:Light pollution reductionposted by Heather Appell on
Our project is a highrise office building in a downtown area.
How to know when is the right time to submit for design review?
posted by Lauren Leatherbarrow on
The project is about to start (after the COVID-19) lockdown and so money is tight - so how long can we wait to submit for design review? This is my first LEED project how do I know when
Required percentage of vegetated area.
CS-v4 SSc3:Open spaceposted by Susan Di Giulio on
I have attended numerous seminars, including an all-day workshop at GreenBuild, on V4 and V4.1, and every time I was told that for this credit, the minimum required vegetated area is 25% of the 30%
Do not have LEED AP yet, but colleague does
NC-2009 IDc2:LEED Accredited Professionalposted by Edgar Arevalo on
I have been trying to find time to take the LEED AP exam but other projects that I'm a part of have been taking up my time that it makes it difficult to study now. However, my colleague who i
Meters for every floor? One Tenant Building
CI-v4.1 EAc3:Advanced Energy Meteringposted by Susan Di Giulio on
In our CI Project, we have a single Tenant. Per this credit, is a meter required for every floor of this 8 floor building? We believe that is not required for this CI project.
Short and Long Term Together?
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
Can short and long term spaces be located together as long as all other requirements are met?