Forum quick links
Option 1 Path 2 - What's Been Your Experience?
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
Hi all,
Show of hands for those that have used Option 1, Path 2, post occupancy flush out:
Do you provide trending data for both phases, or just the preliminary phase?
Legal Sources and Responsible Sources
Pilot-Credits MRpc102:Legal Woodposted by on
I'm trying to pursue this Pilot Credit and see that it has to be wood from legal source (100%) and Responsible Sources (70%).
Labs ramping up for v4.1?
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Erica Downs on
I'm hearing from a potential EHS contractor that the testing labs are having a hard time ramping up to meet the testing requirements of v4.1, and the testing is going to be quite expensive. I
Are VOC Budgets standard practice?
NC-v4 EQc2:Low-emitting materialsposted by Rick Farrell on
As a commercial "wood only" flooring contractor we often do site finished
What transit qualifies?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Peter Doo on
Is this credit earned if amenities are provided for transit stops that do not meet the frequency requirements of SLL Access to Quality Transit?
Walkable Sites
NC-v4 INc1:Innovationposted by Marie Bizzak on
Can anyone help me understand the language in Walkable Site #3? It says:
Reduction Success Rates for Bird Collision Deterrence Methods
Pilot-Credits SSpc55:Bird collision deterrenceposted by Samuel Palmer-Dwore on
I know that bird collision deterrence methods will affect different species in various amount, at different times of year and different locations.
Campus project with Central Plant
NC-v4 EAc4:Demand responseposted by Brightworks Sustainability on
Our project is a student dorm on a university campus.
Demand Response Program demands 50 kW reduction
NC-v4 EAc4:Demand responseposted by Edgar Arevalo on
I have a project in New York CIty where the local utility provides a demand response program where the building would participate in peak load reduction for 4 consecutive hours on a day where the u
Adding Kitchens in the Minimum IAQ Performance Calculator
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
There is no clear selection for kitchens in the occupancy category of the calculator, and yet when I took a look at the IEQ matrix it shows Kitchen spaces are to be included for IEQp1. N