Forum quick links
Indoor Water Use Reduction Calculator for Hotels
NC-v4 WEp2:Indoor water use reductionposted by on
I am working on a 5 story hotel in San Jose, California. I'm trying to finalize the Indoor Water Use Reduction Calculator. The water closets (4 types) have identical gpf rates, so
Under slab insulation required on raised heated (radiant) floor slabs?
Healthcare-v4 EAp2:Minimum energy performanceposted by Deb Favaretto on
Our project is pursuing LEED BD+C for Healthcare v4. Under the Minimum Energy Performance prereq, it is stated that the building must comply with the mandatory provisions of ASHRAE 90.1 2010.
Wet-applied Lubricants
NC-v4 EQc2:Low-emitting materialsposted by Megan White on
Our project is looking at the "Never-Seez NS-160 Regular Grade Compounds" which is wet-applied onsite within the weatherproofing membrane.
Innovation: Design for active occupants
NC-v4 INc1:Innovationposted by Jay R on
Is it mandatory to answer the "Additional Questions" noted in the credit description, or is that optional?
Number of Floors in Project Space, or Building?
Pilot-Credits EQpc117:Quality views in nonregularly occupied spacesposted by JLL Sustainability Consulting on
The percentage floor area required to have quality views is dependent on the number of floors in the building. For a CI project, do we count only the number of floors associated with the proj
Drywall Compound
NC-v4.1 EQc2:Low-Emitting Materialsposted by Catherine Blakemore on
Under what category does dryway compound fall for Low-Emitting materials?
View Factor 3
NC-2009 IEQc8.2:Daylight and views - viewsposted by James Bell on
I have seen several references to View Factor 3 and cannot find any definition.
Fundamental Commissioning of On-Site Solar Array
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Rachel Williams on
I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.
Option 3 - Product Manufacturer Supply Chain Optimization
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Edgar Arevalo on
Has anyone been able to tackle the third option for this credit, which is not shown in the BPDO calculator?
PM-10 Testing
NC-v4 EQc4:Indoor air quality assessmentposted by Robert Cashins on
What method of testing have people used to measure airborne PM-10 dust required as part of V4 IEQ Credit 3.2?
Is real time monitoring acceptable?