Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Indoor Water Use Reduction Calculator for Hotels

NC-v4 WEp2:Indoor water use reduction
posted by     on 

I am working on a 5 story hotel in San Jose, California.  I'm trying to finalize the Indoor Water Use Reduction Calculator.  The water closets (4 types) have identical gpf rates, so

11
Default Avatar
Mechanical Engineer
Dillon Consulting Limited
LEEDuser Basic Member
1 thumbs up
Wed May 18, 2022, 1:44 pm

Under slab insulation required on raised heated (radiant) floor slabs?

Healthcare-v4 EAp2:Minimum energy performance
posted by  Deb Favaretto  on 

Our project is pursuing LEED BD+C for Healthcare v4. Under the Minimum Energy Performance prereq, it is stated that the building must comply with the mandatory provisions of ASHRAE 90.1 2010.

1
Wed May 18, 2022, 1:04 pm

Wet-applied Lubricants

NC-v4 EQc2:Low-emitting materials
posted by  Megan White  on 

Our project is looking at the "Never-Seez NS-160 Regular Grade Compounds" which is wet-applied onsite within the weatherproofing membrane.

5
Default Avatar
LEEDuser Premium Member
1 thumbs up
Tue May 17, 2022, 8:25 pm

Innovation: Design for active occupants

NC-v4 INc1:Innovation
posted by  Jay R  on 

Is it mandatory to answer the "Additional Questions" noted in the credit description, or is that optional?

0

Number of Floors in Project Space, or Building?

Pilot-Credits EQpc117:Quality views in nonregularly occupied spaces
posted by  JLL Sustainability Consulting  on 

The percentage floor area required to have quality views is dependent on the number of floors in the building.  For a CI project, do we count only the number of floors associated with the proj

5
Default Avatar
CA2 CONSULTORES AMBIENTAIS ASSOCIADOS LTDA
LEEDuser Basic Member
0 thumbs up
Tue May 17, 2022, 6:29 pm

Drywall Compound

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Catherine Blakemore  on 

Under what category does dryway compound fall for Low-Emitting materials?

2
Tue May 17, 2022, 1:37 pm

View Factor 3

NC-2009 IEQc8.2:Daylight and views - views
posted by  James Bell  on 

I have seen several references to View Factor 3 and cannot find any definition.

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu May 12, 2022, 6:42 am

Fundamental Commissioning of On-Site Solar Array

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Rachel Williams  on 

I am working on a project that, through a series of contract issues during construction, does not have commissioning documents for the PV array.

2
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Wed May 11, 2022, 6:17 pm

Option 3 - Product Manufacturer Supply Chain Optimization

CI-v4 MRc5:Building product disclosure and optimization - material ingredients
posted by  Edgar Arevalo  on 

Has anyone been able to tackle the third option for this credit, which is not shown in the BPDO calculator?

0

PM-10 Testing

NC-v4 EQc4:Indoor air quality assessment
posted by  Robert Cashins  on 

What method of testing have people used to measure airborne PM-10 dust required as part of V4 IEQ Credit 3.2?

Is real time monitoring acceptable?

0