Forum quick links
Perimeter light levels affected by surrounding sites.
EBOM-v4.1 SSc3:Light Pollution Reductionposted by Rick Walls on
The perimeter light levels are driven by the surrounding light sources such as street lights and adjoining building lights. Do I need to make note of these factors in the credit form?
Pilot -All-Gender Restrooms
CI-v4 INc1:Innovationposted by Laurie Johnson on
I am pursuing the ALL-Gender Restrooms Innovation. Under Requirments for ID+C it reads Restrooms must be included within the project scope of work in order to pursue this pilot credit.
Terrace Planters
CS-v4.1 SSc2:Protect or Restore Habitatposted by Bret Mantyk on
I'm wondering if terrace plantes are totally out of scope for Protect or Restore Habitat or if there are certain specifications that would allow for terrace planters to count towards the credit.
Local Standards Comparisons as Required Documents
NC-v4 SSp1:Construction activity pollution preventionposted by Nate Shroyer on
When working on a project using local standards rather than the 2012 EPA CGP, what is necessary to prove that the local standards are as, if not more, stringent than the CGP. How in depth doe
Indoor Air Quality Assessment
posted by Theresa Scherwitz on
We were planning to achieve Option 2.
v4.1 Tier 1: Onsite Renewable PV Installation
NC-v4.1 EAc5:Renewable Energyposted by Stephanie Graham on
The title of Table 1--"Points for Renewable Energy Procurement" is confusing, as it includes Tier 1. As you indicated under another comment in this credit, it is possible to procur
Calculator - Summary Page missing two units
NC-v4 EQp1:Minimum indoor air quality performanceposted by Cynthia Kaplan on
We are having an issue with our minimum IAQ calculator, namely the summary page. All of the single zone spaces transfer to the summary page fine.
Substituted LEED 4.1 Form on a LEED v4 project
NC-v4.1 IPc1:Integrative Processposted by Vincent Pieri on
Hello,
NCv4 - EAc Advanced Metering - VRF system
NC-v4 EAc3:Advanced energy meteringposted by Margaret Montgomery on
We have a clinic project that is all electric, and will be submetering to meet the Advanced Metering criteria, but we're not finding clarity on one particular point.