posted by  Robert Shields  on 

We are working on a project to build a Toyota Dealership in Pennsylvania and the owner is seeking LEED Certification (LEED 2009).

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Wed Apr 1, 2015, 8:32 pm

Must I continue to audit if 50% is reached during PP

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Vanessa Seibert  on 

Our building did divert 50% of ongoing consumables during out last LEED EBOM certification in 2010. We did perform a waste audit at that time so we acquired MRc6.

5
Principal, Architect
Verde Concepts
LEEDuser Basic Member
34 thumbs up
Tue Mar 31, 2015, 5:53 pm

C&S Individual Project within a Campus Registration

LEED Guidance for Campuses and Multiple Buildings
posted by  Nate Steeber  on 

This may be a very simple question, and perhaps our team is looking into this too deeply: We have a campus which we intend to use a Master Site with individual registrations (i.e. not a group).

3
Project Manager, Sustainability
Sol design + consulting
LEEDuser Basic Member
13 thumbs up
Fri Mar 27, 2015, 9:07 pm

Areas passing at one time but not another

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Lisa Fabula  on 

If part of the building area passes at 9am but does not pass at 3pm does that mean we cant use that 9am area for that time.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Mar 27, 2015, 4:06 pm

Hello,
I am documenting this

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Michael Russo  on 

Hello, I am documenting this credit using the simulation method. For many of the regularly occupied spaces, the rooms are above the 10fc requirement except for a small corner of the room.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Mar 26, 2015, 11:00 pm

Duration for online survey

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Jessica Hawley  on 

We are planning on sending out an emailed link to an online electronic transportation survey on a Monday to survey our building's entire tenant population about their commute for the prior week (M-

3
Default Avatar
Real Estate Sustainability Professional
LEEDuser Basic Member
0 thumbs up
Thu Mar 26, 2015, 9:09 pm

Is EAc2 affected by the use of the ACP calculation for EAc1?

CS-2009 EAc2:On-site Renewable Energy
posted by  Charlie Christenson  on 

Working on a core & shell project that is planning to install a PV system sized to offset 1% of total building energy cost.

3
Thu Mar 26, 2015, 7:05 pm

Energy Star Portfolio Manager

Schools-2009 EAc5:Measurement and Verification
posted by  Becky Dix  on 

Is it possible to achieve one point of this credit (like you can for NC) by just registering the project with Energy Star Portfolio Manager?

6
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Mon Mar 23, 2015, 8:17 pm

LEED Credit Timeline

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Brenna Martin-Shaffer  on 

During the process of our split submission information was submitted to GBCI that affected both a prerequisite as well as a credit we were pursuing.

3
Mon Mar 23, 2015, 6:32 pm

Demolition of existing building

Schools-2009 MRc2:Construction Waste Management
posted by  Matthew Heaton  on 

I’ve encountered a differing of opinions regarding the Construction Waste management credit (MRc2) and could use some help.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Mar 23, 2015, 3:54 pm