Can I defer any ID credit to submit it w/ construction package ?
posted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Where do I upload the response report for Design Final Package ?
posted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
Thermal Comfort Survey
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Leed User on
I used the survey template provided on this site and was denied the credit saying it did not address all of the ASHRAE 55-2004 environmental variables (air speed, humidity, radiant temperature, and
EAp2-4: Energy Star equipment: conversion from kWa to Watts
CI-2009 EAp2:Minimum Energy Performanceposted by Sarah Simchuk on
I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.
Where to find the Ecologo-certified products?
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Helen Samuel on
Now that Ecologo was acquired by UL, where can I find which products are Ecologo-certified?
EV Ready acceptable?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Dylan Connelly on
For Core & Shell projects - is installing 3% of the parking stalls to be EV ready acceptable to achieve these points?
EAc5 Option 3
NC-2009 EAc5:Measurement and Verificationposted by Sheryl Swartzle on
Our client chose Option 2 on the PIf1 and the form has been approved. They have decided to pursue the 1 point available in EAc5 for choosing Option 1 in PIf1.
Tools for demonstrating solar orientation
Homes-v2008 IDc1:Integrated project planningposted by Erica Downs on
Is anyone aware of any tools for demonstrating the east-west axis of the house is within 15 degrees of due east-west? Or do I need to bust out my protractor?
LEED NC 2009 Group Certification
NC-2009 PIf1:Minimum Program Requirementsposted by Neumann Monson on
Our project consists of two buildings on a shared site, to be built in two phases.
Combined Staff Break Room and Cleaning Materials Storage
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Ryan Hoffman on
Our project is the renovation of a space that will be cleaned by an outside contractor.