Exemplary Performance?

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  José Solis  on 

The BD+C Reference manual states: "This credit is not eligible for exemplary performance under the Innovation in Design section." However, a response from Tristan Roberts on June 4, 2010 states th

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2016, 6:47 pm

Room Input Report

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Bill Friedl  on 

I had a comment on a LEED review in IEQc7.1 to provide a summary table which lists the heating and cooling design parameters used for each space type and the Room Input Reports for each space type.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Apr 25, 2016, 6:12 pm

Option 1 Path 2 Temperature and Humidty Requirements

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Amy Harmon  on 

Path 1 indicates flush-out needs to be accomplished with 14,000 cu ft. of OA per sq. ft. of floor area while maintaining an internal temperature of at least 60 deg F and no more than 60% RH.

3
Default Avatar
Scheeser Buckley Mayfield
LEEDuser Basic Member
0 thumbs up
Fri Apr 22, 2016, 2:07 pm

3 LEED projects sitting on a parking & retail layer cake

NC-2009 MRc4:Recycled Content
posted by  Susan Di Giulio  on 

Hi, We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects.

6
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Apr 21, 2016, 5:50 pm

REVIT 2016 Daylight Analysis Tool not acceptable?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Deborah Lucking  on 

We submitted for this credit using the results from the REVIT 2016 daylight analysis tool.

2
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Thu Apr 21, 2016, 12:39 pm

Multi-Family Buildings with Non-Residential Entrances

ND-v2009 NPDc9:Access to civic and public space
posted by  Sara Zoumbaris  on 

Hi, we have a site with several multi-use buildings which have non-residential entrances and a main entrance which will lead to residential lobby etc.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Tue Apr 19, 2016, 8:27 pm

Fire Station FTE

NC-2009 PIf3:Occupant and Usage Data
posted by  Deborah Morgan  on 

I have a fire station that will have 9 fire fighters working 24-hour shifts. 1.

3
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Mon Apr 18, 2016, 8:54 pm

Alternative Compliance for M&V

NC-2009 EAc5:Measurement and Verification
posted by  Deborah Lucking  on 

All, our project is a large and complex convention center remodel/expansion. We are proposing a metering strategy that is tailored to the way the building will be operated.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4458 thumbs up
Mon Apr 18, 2016, 4:55 pm

Alternative calculation for MRc2

NC-2009 MRc2:Construction Waste Management
posted by  Marcia Weekes  on 

It has come to my attention that in my local market, most if not all waste management companies use visual inspections to determine recycling rates for commingled loads.

8
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Apr 15, 2016, 9:56 am

conductive rubber flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Lyle Axelarris  on 

In the past, we've used FloorScore-certified Static Dissipative rubber Tiling for Comm rooms. The client is now asking for conductive rubber flooring instead of dissipative.

4
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Fri Apr 15, 2016, 1:31 am