Cold Climate

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Erin Holdenried  on 

Does anybody have experience using an alternate compliance path for a project in a cold climate?

5
Default Avatar
Sustainability Specialist
PDC Inc. Engineers
LEEDuser Basic Member
0 thumbs up
Mon Jun 6, 2016, 10:24 am

How to implement WELL in a partially occupied building...?

WELL v1 Building Standard Tip Sheet
posted by  Brian Salazar  on 

Hello! First, thank you Tristan for adding a WELL discussion to this site. I'm sure it will be a great resource for a whole host of "do gooders" like myself.

4
Assistant Project Manager, LEED AP BD+C, WELL AP, CPHC
The Green Engineer, Inc.
LEEDuser Basic Member
7 thumbs up
Thu Jun 2, 2016, 2:58 pm

Athletic Field Definition

NC-v4 WEc1:Outdoor water use reduction
posted by  Michelle DiPenti  on 

Our project has an outdoor area, as a part of the sports medicine department, which patients will use to do sprints, drills, and other exercises.

3
SW Regional Design Resilience Leader
Gensler
LEEDuser Basic Member
15 thumbs up
Thu Jun 2, 2016, 1:50 pm

Initial fit-out vs alteration

CI-2009 PIf2:Project Summary Details
posted by  Kate Bubriski  on 

I have a project that is a tenant fit-out in an existing building.

6
Wed Jul 9, 2025, 6:47 pm

Project Boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sharon Dearstyne  on 

We have a 11 story Historical hotel with 6 floors of Guest Rooms that are being completely renovated. The remaining floors are Ballrooms, meeting spaces and retail.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 26, 2016, 6:30 pm

SLLc6 in v2009 vs v4 - no slopes do/don't qualify?

ND-v4 SLLc6:Steep slope protection
posted by  GBD Architects  on 

Hi, the language in v4 is a little different from the v2009. v2009 explicitly says that sites without slopes can automatically qualify for the point. Does v4 remove that option?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Thu May 26, 2016, 3:31 pm

promise for future showers?

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Kristen Magnuson  on 

The project in question is an existing single story C&S being renovated.

2
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Wed May 25, 2016, 7:36 pm

Central Plant - Condenser Loop

CS-2009 EAc1:Optimize Energy Performance
posted by  MKK LEED  on 

We are working on a project with two buildings on one site, one commercial C&S, one Hotel.

5
Default Avatar
MKK Consulting Engineers
LEEDuser Basic Member
1 thumbs up
Tue May 24, 2016, 6:16 pm

Integrative Process-Value Engineering

Pilot-Credits PC60:Integrative Process
posted by  Susan Coy  on 

Do you use Value Engineering in documenting this process?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue May 24, 2016, 12:18 am

Mix LEED NC and LEED CS within LEED Campus?

LEED Guidance for Campuses and Multiple Buildings
posted by  Nelina Loiselle  on 

We have a project that has six buildings on it. The owner wants five of them to be CS, and one of them to be NC. Are we able to mix rating systems within an overall LEED Campus registration?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon May 23, 2016, 3:58 pm