NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin Holdenried on
Does anybody have experience using an alternate compliance path for a project in a cold climate?
How to implement WELL in a partially occupied building...?
posted by Brian Salazar on
Hello! First, thank you Tristan for adding a WELL discussion to this site. I'm sure it will be a great resource for a whole host of "do gooders" like myself.
Athletic Field Definition
NC-v4 WEc1:Outdoor water use reductionposted by Michelle DiPenti on
Our project has an outdoor area, as a part of the sports medicine department, which patients will use to do sprints, drills, and other exercises.
Initial fit-out vs alteration
CI-2009 PIf2:Project Summary Detailsposted by Kate Bubriski on
I have a project that is a tenant fit-out in an existing building.
Project Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sharon Dearstyne on
We have a 11 story Historical hotel with 6 floors of Guest Rooms that are being completely renovated. The remaining floors are Ballrooms, meeting spaces and retail.
SLLc6 in v2009 vs v4 - no slopes do/don't qualify?
ND-v4 SLLc6:Steep slope protectionposted by GBD Architects on
Hi, the language in v4 is a little different from the v2009. v2009 explicitly says that sites without slopes can automatically qualify for the point. Does v4 remove that option?
promise for future showers?
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Kristen Magnuson on
The project in question is an existing single story C&S being renovated.
Central Plant - Condenser Loop
CS-2009 EAc1:Optimize Energy Performanceposted by MKK LEED on
We are working on a project with two buildings on one site, one commercial C&S, one Hotel.
Integrative Process-Value Engineering
Pilot-Credits PC60:Integrative Processposted by Susan Coy on
Do you use Value Engineering in documenting this process?
Mix LEED NC and LEED CS within LEED Campus?
posted by Nelina Loiselle on
We have a project that has six buildings on it. The owner wants five of them to be CS, and one of them to be NC. Are we able to mix rating systems within an overall LEED Campus registration?