Project Building Activity - Residence Hall
NC-2009 PIf3:Occupant and Usage Dataposted by Anna Lapomme on
I'm currently working on a project in Jersey City for a University that is building a new residence hall.
Structure and enclosure
Schools-NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Allison Zuchman on
One of the most impactful changes to this credit from LEEDv3 is: "Structure and enclosure materials may not constitute more than 30% of the value of compliant building products." In my experience s
Option 1: Calculated Water
EBOM-v4 WEp1:Indoor water use reductionposted by Ileana Delgado on
I am working on WE prerequisite for Indoor water use reduction and we decided to go with the 1st option.
Stormwater pond outside boundary
NC-2009 WEc1:Water Efficient Landscapingposted by Derek Seifert on
Hello all, Our project is intending to use a LEED boundary that is only a portion of a larger site.
Master's Research Survey
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
Campus PV dedicated - not connected - to building requires Cx?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Joyce Kelly on
A portion of a nearby, existing campus PV system has been dedicated - not connected - to our building.
Solar energy used with previous LEED project credit
NC-2009 EAc2:On-Site Renewable Energyposted by Zane Lichtneger on
We have a solar farm on our site that generates about 1.7 million kWh of electricity per year. The array is 100% grid tied selling all energy back to the public utility.
Timing of ASHRAE Level I & II & BAS System Install
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Marie Kirk on
We are going for LEED EBOM v 2009 and need to finish the process by Spring 2017. An engineering firm is getting ready to do an ASHRAE Level I & II audit for us to receive the EA Credit 2.1.
"Provide calculations to confirm the quantity......"
NC-2009 WEc1:Water Efficient Landscapingposted by Joyce Kelly on
We are having difficulty figuring out what the following review comment means. "Provide calculations to confirm the quantity of nonpotable water used for irrigation (52,148.46 gallons in July.) The
Would an Evaporative Cooler Be Considered a Cooling Tower?
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Michelle Bracewell-Musson on
We have 2 cooling towers and 4 evaporative coolers (Climate Wizard). Would these all be considered cooling towers with reference to this credit?