Forum quick links
Dorm Lighting
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jordan Altaras on
Hello, I have a question relating to lighting control in dorm rooms: My understanding of credit 6.1 was that 90% of building occupants needed their own lighting control.
URGENT - Eligibility Advice needed right away!
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Erica Downs on
If anyone can, I need an answer ASAP -- The project will be a new-construction Concrete Manufacturing Plant.
NC Credit IEQ 8.2-Views Maintenance Shop
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Leslee Randolph on
I am working in V2009 (post 2014).
Signage for Each Space
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Neumann Monson on
Is it possible to sign a bank of parking spaces in lieu of signing each space individually? If signing a bank with arrows, how far or how many spaces are acceptable.
FSC Chain of Command for MR7 and IDP1.5
NC-2009 MRc7:Certified Woodposted by Daniel Meehan on
Looking to achieve 95% FSC for a very small project with the largest wood component being cabinetwork.
Low E Vehicle parking calculation
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Dina Cheyette on
In order to find how many Low E parking stalls we need to provide, we must multiply the number of parking stalls on our site by 5%.
Option 2 Air Testing- Measuring VOCs
NC-v4 EQc4:Indoor air quality assessmentposted by Helene Lefkowitz on
While looking into Option 2- Air Testing, a member of our project team presented the following questions as they believe this method is not achievable at this time: 1) Are there currently any labs
Circulating Fans
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I have some fans In my building which operate to circulate air. They are low speed when occupied and then ramp up to full speed with Temperature goes above 80F.
Pilot Credit 87: Verified C&D Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Sara Greenwood on
Hello, I am working on a project located in San Jose which has hired a waste hauler that undergoes third-party verification to confirm their waste diversion rates.
Mechanical Ventilation for Multifamily Highrise Bedrooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Neil Sen on
I'm working on a Multifamily Highrise building. The bedrooms will not have operable windows, so it looks like they need to be mechanically ventilated.