Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Guidance for approaching outdoor swimming pools for a municipal project

LEED v4.1 Discussion Forum
posted by  Edward Reifenstein  on 

We are designing a community center and aquatics facility with several outdoor pools.

1
Tue Jun 11, 2024, 2:54 pm

Location of outside airflow measuring station inside the HVAC unit

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Edgar Arevalo  on 

We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space.  Since there is no recirculating air getting reintroduced to the supply side, the MEP engine

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Jan 5, 2024, 3:05 pm

LEED v4 Heat Island Reduction - include elevator shafts and stairwell enclosures in roof calcs?

NC-v4 SSc5:Heat island reduction
posted by  Julie Baines  on 

Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO.

9
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Jan 4, 2024, 6:20 pm

Location of outside airflow measuring station inside the HVAC unit

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Edgar Arevalo  on 

We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space.  Since there is no recirculating air getting reintroduced to the supply side, the MEP engine

0

Pharmacy Mail Order | Buy Xanax Without Rx - Medz Here Drugstore

SITES Discussion Forum
posted by  Benjamin Phelps  on 

Xanax is a type of medication used to treat mental health conditions such as anxiety, depression, or panic disorder.

0

One Tenant - two spaces across a public corridor - can this be certified as one project?

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Helen Kessler  on 

The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor.  Seems to me this is no different from a tenant that is on multiple l

4
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Wed Jan 3, 2024, 1:25 pm
6
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Tue Jan 2, 2024, 6:38 pm

Waste management plan submission with multiple GC's

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Blake Weaver  on 

I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different GC.

1
Wed Apr 17, 2024, 1:00 am