Forum quick links
Future open space preservation- Campus project
NC-v4 SSc3:Open spaceposted by Andy Rhoades on
My question is regarding a multi-phased campus project. Are we able to count future planned open space towards the credit threshold, and if so, what documentation would this require (i.e.
Partial Floor LEED Certification
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified. The project space is approximately 52% - 60% of the total floor
Existing PV on previously certified project
NC-v4 EAc5:Renewable energy productionposted by Yu Zhang on
I have a project that is a new building located on a previous certified LEED project with PV production. The previous project had >90% offset by energy use and >100% offset by cost from
Waste performance yields a score of zero points in ARC
EBOM-v4.1 MRp3:Waste Performanceposted by jimmy Adames on
Hi, Our building is a very automated distribution center for an apparel company. Due to the nature of the business, we receive cardboard cases with product and before it ships to customers, a
One-time air testing: how to enter readings in the ARC platform
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by jimmy Adames on
Greetings, I have a few questions regarding this credit.
Confirmation of Agent's Authority
posted by Aaron Kennedy on
We are filling out the Confirmation of Agent's Authority. Does the agent need to be the LEED Accredited Professional or can it be me, the lowly non LEED certified person?
Integrative Process Facilitator
NC-v4.1 IPc1:Integrative Processposted by Edward Reifenstein on
The Integrative Process credit for v4.1 BD+C: New Construction refers to an "Integrative Process Facilitator" who has responsibility for running the early charrette and tracking the results, u
Minimum OA Options
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Courtney Mayes on
Hello, I have a site that has a shared OAD for two units. The duct is not large enough to supply the minimum OA, and one of the spaces have changed usage. Even with reduced C
Are Sidewalks Required
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Alexandre Penegre on
We have a building that will be in the middle of a rural town. We easily meet the diverse uses within proximity, but there are no sidewalks.
Previously developed land
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Rebekah Brown on
Hi,