Material Reuse

NC-2009 MRc3:Materials Reuse
posted by  Scott Gharda  on 

I am working on a project where we will be renovating an existing 2 story warehouse to turn it into office space.

1
Mon Jan 30, 2017, 10:49 pm

LEED Design submital - First Review

General forums
posted by  Bridget Brock  on 

At what point do you make the initial design submittal? I have a project that has the 50% construction documents being currently reviewed by the building department.

0

Regularly Occupied Spaces

NC-2009 PIf3:Occupant and Usage Data
posted by  Lauren Bellamy  on 

Hi, I am working on a project under LEED BD+C that has some shell space that will no be outfitted until well after the completion of the construction and LEED documentation.

1
Wed Oct 15, 2014, 5:39 pm

video conferencing equipment

CI-2009 EAp2:Minimum Energy Performance
posted by  Kristen Magnuson  on 

Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified.

1
Sun Mar 20, 2016, 11:56 pm

Clarifying 20 different materials from 5 different manufacturers

Schools-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Cynthia Kaplan  on 

As I interpret the language of this credit, can I assume that I can submit say, three different types of ceiling tile from one manufacturer, and this would count as three different materials?

1
Wed Jun 8, 2016, 1:58 pm

IEQ4.1 Aerosol Adhesives conversion

Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Kevin Taterus  on 

Using IEQc4.1 template version 4.0, in the notes under table IEQc4.1-1, the note #1 states "in the case of aerosol adhesives, the project team must provide a conversion of both the product VOC cont

1
Wed Oct 12, 2016, 3:11 pm

IECc6.1 Hotel Servery

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Glenn Haydu, AIA, LEED AP  on 

Our LEED review for the breakfast servery offered in the hotel is that we do not comply with multi-occupant spaces for lighting controls. We offered occupancy sensor with "forced off" override.

1
Mon Aug 3, 2015, 8:45 pm

Air economizer in baseline model

CS-2009 EAc1:Optimize Energy Performance
posted by  Jeff Riggs  on 

If your climate zone does not require air econmizer for baseline systems (90.1 2007, climate zone 4a) are you allowed to model your proposed systems with economizer, per design and not have economi

1
Tue Nov 15, 2016, 11:21 pm

Prefinished wood flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Brianna Brandsen  on 

when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site

1
Fri Feb 10, 2017, 7:02 pm

IAQ Testing

Discuss the LEED Dynamic Plaque and Arc
posted by  Roland Jones  on 

I have been asked to provide IAQ Testing for LDP, and am having trouble finding the distinctions between the normal pre-occupancy sampling for credit 3.2 and the during occupancy sampling of LDP.