Non-Conventional purchases
EBOM-v4 MRc1:Purchasing - ongoingposted by Becky Stumm on
I'm working on a convention center, and they don't buy many office supplies. Their major purchases are cleaning supplies ( and fits in the IEQ- green cleaning credit) and uniforms.
2-seat Reception Area in Middle School
Schools-2009 IEQc6.1:Controllability of systems - lightingposted by Sara Zoumbaris on
Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.
New LEED building within existing LEED project site boundary
posted by Krissy Buck Flickinger on
I have a building registered under LEED NCv2009, that is being built entirely within the LEED boundary of a certified LEED NCv2.2 Gold project. Same owner.
Packaging?
NC-2009 MRc4:Recycled contentposted by Caroline O'Leary on
Here's one I haven't seen and would love for people to weigh in on. A manufacturer of, let's say paint, has provided recycled content information but it's for the buckets their product comes in.
Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.
Existing HVAC system efficiency
CI-v4 EAp2:Minimum energy performanceposted by Richard Mathews on
Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.
Different equipment types or all equipment units in scope
CI-2009 EAp3:Fundamental refrigerant managementposted by Edgar Arevalo on
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.
Daylight and Views - RP For Earning 1 Point For Just Daylight?
EBOM-2009 RPc1:Regional priorityposted by Michelle Bracewell-Musson on
Hello, To earn EP, a project must earn 75% for Daylight AND 90% for Views. For Regional Priority, can it just be meeting the 50% of only DAYLIGHT, to earn the Regional Priority point?
Adhesive- expansion joints
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Stephanie Santiago on
Quick question on how to classify epoxy adhesive for expansion joints: The product data from the vendor, Emseal, states the VOC is 100 g/l, now which VOC limit do I use since these joints will be
Previously Developed AND Wetlands
NC-v4 LTc2:Sensitive land protectionposted by Becky Johnson on
My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.