Non-Conventional purchases

EBOM-v4 MRc1:Purchasing - ongoing
posted by  Becky Stumm  on 

I'm working on a convention center, and they don't buy many office supplies. Their major purchases are cleaning supplies ( and fits in the IEQ- green cleaning credit) and uniforms.

1
Tue Jun 6, 2017, 11:49 pm

2-seat Reception Area in Middle School

Schools-2009 IEQc6.1:Controllability of systems - lighting
posted by  Sara Zoumbaris  on 

Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.

1
Fri Dec 5, 2014, 4:01 pm

New LEED building within existing LEED project site boundary

LEED Guidance for Campuses and Multiple Buildings
posted by  Krissy Buck Flickinger  on 

I have a building registered under LEED NCv2009, that is being built entirely within the LEED boundary of a certified LEED NCv2.2 Gold project. Same owner.

1
Thu Aug 17, 2017, 10:26 pm

Packaging?

NC-2009 MRc4:Recycled content
posted by  Caroline O'Leary  on 

Here's one I haven't seen and would love for people to weigh in on. A manufacturer of, let's say paint, has provided recycled content information but it's for the buckets their product comes in.

1
Thu Mar 5, 2015, 12:39 am

Copy area in office - acoustical treatment

CI-v4 EQc9:Acoustic performance
posted by  Leticia SooHoo  on 

Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.

1
Thu Jan 19, 2017, 9:22 pm

Existing HVAC system efficiency

CI-v4 EAp2:Minimum energy performance
posted by  Richard Mathews  on 

Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.

1
Wed Jan 18, 2017, 11:51 pm

Different equipment types or all equipment units in scope

CI-2009 EAp3:Fundamental refrigerant management
posted by  Edgar Arevalo  on 

For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.

1
Wed Jan 18, 2017, 10:50 pm

Daylight and Views - RP For Earning 1 Point For Just Daylight?

EBOM-2009 RPc1:Regional priority
posted by  Michelle Bracewell-Musson  on 

Hello, To earn EP, a project must earn 75% for Daylight AND 90% for Views. For Regional Priority, can it just be meeting the 50% of only DAYLIGHT, to earn the Regional Priority point?

1
Thu Mar 10, 2016, 4:08 am

Adhesive- expansion joints

Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Stephanie Santiago  on 

Quick question on how to classify epoxy adhesive for expansion joints: The product data from the vendor, Emseal, states the VOC is 100 g/l, now which VOC limit do I use since these joints will be

1
Fri Oct 3, 2014, 4:13 pm

Previously Developed AND Wetlands

NC-v4 LTc2:Sensitive land protection
posted by  Becky Johnson  on 

My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.

1
Thu Mar 3, 2016, 8:37 pm