Forum quick links
MPR3 - Hotel in Mixed Use Building
CI-2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants.
Hotels: separate surveys & corrective measures 4 guests & FTEs?
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Susan Di Giulio on
HI, Continuing the Hotel conversation, the 2013 IEQ matrix indicates that guestrooms, front desk and BOH - housekeeping areas should be included for IEQc7.2.
MRc5 Material Tracking/Documentation
CS-2009 MRc5:Regional materialsposted by Maggie Hogan Skaug on
RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.
Task Lights in Scope
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Jonathan Weiss on
Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.
Dirt road?
NC-2009 SSc7.1:Heat island effect - nonroofposted by emily reese moody on
This is the first time I've had a project that has both existing and new dirt roads that will not be paved, or covered with gravel, or anything else. I'm not really concerned about the SRI aspect (
Conveying systems now accepted for this credit
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
cabinet millwork
NC-2009 MRc7:Certified woodposted by Karl Heitman on
We are installing plastic laminate millwork with particle board core which is not FSC certified. Does the cabinet costs need to be counted towards the total wood used in the project?
Table IEQc7.1-1 Design Air Speed at 3 ft ht (ft/min)
NC-2009 IEQc7.1:Thermal comfort - designposted by Ed Kokosa on
I've seen previous versions of this question on the forum and the typical answer is to look at design information provided by diffuser manufacturers. As others have replied back, the standard is to
Using interpretation 10203 for a hotel site
NC-2009 PIf1:Minimum Program Requirementsposted by Susan Di Giulio on
We have a LEED-NC 2009 hotel project and are trying to determine if we conform to interpretation ID#10203 of 07/01/2012 allowing certain hotel, school and other multiple-building projects to regist
Existing Building, Renovations Taking Place Piecemeal
CI-v4 EQc4:Indoor air quality assessmentposted by Sara Zoumbaris on
We have a university lab project that is renovating a select number of rooms, with varying materials/ systems being replaced at different times.