Forum quick links
Replacing filters prior to occupancy
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ashley Love on
We have our preliminary review comments back and had a comment on this credit about the timeline of replacing the filters.
Number of signs required to be considered "comprehensive"
NC-2009 IDc1:Innovation in Designposted by Kristin Walsh on
I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.
Pre-Rinse Spray Valves in Laboratories
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Wyatt Suddarth on
I have several pre-rinse spray valves that were specified by an external laboratory consultant in a college laboratory building that do not appear to meet the requirement of being less than or equa
Site Management Policy
posted by Kelsey Jensen on
When compiling the list of requirements for this policy I was wondering if there is a specific goal that must be met to be considered "low emissions" for maintenance equipment?
Meter for Water Use in Laundry
Healthcare-v2009 WEc2:Water use reduction - measurement and verificationposted by Jon Penndorf on
Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks
Does gravel count?
NC-v4 SSc3:Open spaceposted by Harvard University Green Building Services on
Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?
How to use combination of Option 1 and Option 2?
NC-2009 MRc5:Regional Materialsposted by Erica Downs on
In the FAQ section above, it says "The two options are available to be used on the basis of an individual product or material, so you can mix and match as needed." Does anyone know how to do this?
DES Option 1 - Baseline System
NC-v4 EAp2:Minimum energy performanceposted by Jay patel on
I am modeling a new building(Laboratory/office) on a university campus following LEED v4 Option 1, Whole Building Energy Simulation. New Building is 3 story and 69,500 sq.ft .
Monitoring Period
Pilot-Credits EApc65:Monitoring based commissioningposted by Mari Hamasaki on
What is the required monitoring period for this credit?
Master's Research Survey
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.