Appeal after second review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Johnathan Woodside  on 

I guess my question is; does the second review include review of changes made as a result of comments made during the second review?

1
Mon May 4, 2015, 8:54 pm

Does FloorScore apply to subfloor surfaces?

CI-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Edgar Arevalo  on 

I have a project where I received a submittal for a subflooring hard surface material.

1
Wed Mar 15, 2017, 3:50 pm

LEED Boundary and Non-contiguous reconfigured areas

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aaron Ketner  on 

Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.

0

System Type 9 Baseline Fan Sizing

NC-2009 EAp2:Minimum energy performance
posted by  Brian Kenney  on 

I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.

1
Fri Jun 2, 2017, 1:48 pm

Any HAP Expert?

NC-2009 EAp2:Minimum energy performance
posted by  Khaled Fouda  on 

I use Carrier-HAP and according to ASHRAE 90.1 G.1 #4, all baseline HVAC fans should be running continuously when the space is occupied and cycled when the space is unoccupied.

1
Mon Dec 1, 2014, 4:20 pm

Energy Effiicency Measures

CI-v4 EAc2:Optimize energy performance
posted by  Kalyan Nishtala  on 

Under option one for compliance (energy simulation), which measures can credit be taken for?

1
Fri Mar 17, 2017, 2:01 pm

Option 1 - What to include in Site Area calc

CS-2009 SSc2:Development density and community connectivity
posted by  Jay Murray  on 

I have 15 properties that fall within my Density Radius. I did not include the public roads in this square footage calculation, nor did I include a public parking lot that fell within my radius.

1
Thu Apr 14, 2016, 12:16 am

Fluorescent Light Tubes and Donation of Equipment

CI-2009 MRc2:Construction waste management
posted by  Joseph Sneed  on 

I have two questions: I would like to confirm that the weight of fluorescent tubes that I recycled are to be added to total weight calculations used for MR2 although they don't weigh much.

1
Wed Dec 3, 2014, 3:37 pm

Steam Kettles for Process Water Use

Retail-CI-v2009 WEp1:Water use reduction
posted by  David Hryvniak  on 

I'm working on a project that is installing steam kettles for commercial food service. The equipment consists of two 6-gallon kettles mounted on a modular base.

0

MPR 6 & USGBC Energy and Water Data Release form

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Katie Peterschmidt  on 

Could we get a confirmation on whether the utility release form is still applicable?

1
Tue Jun 9, 2015, 10:03 pm