posted by Johnathan Woodside on
I guess my question is; does the second review include review of changes made as a result of comments made during the second review?
Does FloorScore apply to subfloor surfaces?
CI-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Edgar Arevalo on
I have a project where I received a submittal for a subflooring hard surface material.
LEED Boundary and Non-contiguous reconfigured areas
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aaron Ketner on
Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.
System Type 9 Baseline Fan Sizing
NC-2009 EAp2:Minimum energy performanceposted by Brian Kenney on
I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.
Any HAP Expert?
NC-2009 EAp2:Minimum energy performanceposted by Khaled Fouda on
I use Carrier-HAP and according to ASHRAE 90.1 G.1 #4, all baseline HVAC fans should be running continuously when the space is occupied and cycled when the space is unoccupied.
Energy Effiicency Measures
CI-v4 EAc2:Optimize energy performanceposted by Kalyan Nishtala on
Under option one for compliance (energy simulation), which measures can credit be taken for?
Option 1 - What to include in Site Area calc
CS-2009 SSc2:Development density and community connectivityposted by Jay Murray on
I have 15 properties that fall within my Density Radius. I did not include the public roads in this square footage calculation, nor did I include a public parking lot that fell within my radius.
Fluorescent Light Tubes and Donation of Equipment
CI-2009 MRc2:Construction waste managementposted by Joseph Sneed on
I have two questions: I would like to confirm that the weight of fluorescent tubes that I recycled are to be added to total weight calculations used for MR2 although they don't weigh much.
Steam Kettles for Process Water Use
Retail-CI-v2009 WEp1:Water use reductionposted by David Hryvniak on
I'm working on a project that is installing steam kettles for commercial food service. The equipment consists of two 6-gallon kettles mounted on a modular base.
MPR 6 & USGBC Energy and Water Data Release form
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Katie Peterschmidt on
Could we get a confirmation on whether the utility release form is still applicable?