After a design or construction submittal review, if one (or more) of the ID credits is not accepted, may it be replaced with a different ID attempt on the re-submittal?
Myles Huddart
LEED AP BD+C
Forum discussion
NC-2009 IDc1: Innovation in Design
After a design or construction submittal review, if one (or more) of the ID credits is not accepted, may it be replaced with a different ID attempt on the re-submittal?
Myles Huddart
LEED AP BD+C
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Susan Walter
HDRLEEDuser Expert
1296 thumbs up
February 20, 2015 - 4:34 pm
Swap away. I always like to have a couple of extra ID ideas in case something gets rejected. It can be easier to document a new credit instead of massaging a submitted credit that got shut down. Swapping out between design and construction reviews is not a problem. If you have a final construction review and still need that ID point, you'll have to appeal to get them to consider the new ID credit. I'm sure someone outlines that in this forum.