getting hot water from CHP, but not the power. Can I still get the credit of the power produced?
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hi! My project is getting hot water from the central combined heat and power plant in the campus, but it's NOT getting the electricity from it.
LEED 4.1 Tier 2 & 3 Renewable Energy and District or Campus Thermal Energy (DES)
NC-v4.1 EAc5:Renewable Energyposted by Hans Marsman on
We are working on a building connected to a campus central plant (DES).
50% Unbound
Healthcare-v4 SSc5:Heat island reductionposted by Lene Hill on
What does unbound mean? How is unbound determined?
WE Indoor water use reduction - Detention facility requirements
NC-v4 WEp2:Indoor water use reductionposted by Lawrence Rennell on
We are currently working on 2 small detention facilities (25 beds and 60 beds). Both projects are new construction and are not Retail, school, or hospitality projects.
If a parcel crosses the 1/4 mile radius, does it count?
CS-v4 LTc4:Surrounding density and diverse usesposted by Armond Dai on
On the map I ploted a 1/4 mile radius from the project boundary. There are lot of parcels of buildable land that are partially within the radius and partially outside the radius.
Calculating CO2 setpoint for carbon dioxide monitoring
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Edgar Arevalo on
I've been looking at Appendix C of ASHRAE 62.1-2010 for a way, and I keep scratching my head. Does anyone how to calculate for the CO2 setpoint to pursue the carbon dioxide monitoring strateg
No Cooling Tower ACP Feedback
Pilot-Credits WEpc94:No Cooling Towerposted by on
I found this pilot credit to be a great way to allow projects to earn credit for the design choice of choosing not to utilize cooling towers on the project even for buildings that are lar
Irrigation Establishment Period Flexibility / Regional Adjustments
NC-v4 WEp1:Outdoor water use reductionposted by Pooja Sannamani on
For the WE pre-requisite and credit Outdoor Water Use Reduction, specifically Option 1 (No Irrigation Required), can the irrigation system installed go beyond the maximum two-year
Gross Floor Area
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage. Since gross floor area also includes the exterior wall
Total Material Cost
posted by Arda Buyuklu on
Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form?