Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

INpc 137 Safety First: Cleaning your space for emerging pathogens

NC-v4 INc1:Innovation
posted by  Glen Boldt  on 

What are some other testing strips that are readily available to test the cleanliness of a surface?

 

1
Wed Sep 17, 2025, 12:56 pm

Determining Retention Requirements

NC-v4.1 SSc4:Rainwater Management
posted by  Callie Reymann  on 

Our rainwater calculations are right on the cusp of reaching the 90th percentile and earning the full three points (+ regional priority point) for this credit.

2
Sustainability Specialist
Quinn Evans
LEEDuser Premium Member
0 thumbs up
Tue Sep 9, 2025, 5:21 pm
2
Thu Sep 4, 2025, 6:15 pm

Design for Indoor Air Quality and Infection Control Documentation

Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Control
posted by  Katherine Tich  on 

Anyone with experience documenting this credit - did you submit with the design credits or with the construction credits?

2
Sustainability Specialist
Jacobs
LEEDuser Premium Member
3 thumbs up
Tue Sep 2, 2025, 8:32 pm

Stakeholder Engagement

Pilot-Credits INpc122:Informing Design by Major Credit Category Using Triple Bottom Line Analysis
posted by  Mansoureh Jalali  on 

What strategies or best practices can help project teams engage stakeholders in the Triple Bottom Line analysis to ensure diverse perspectives and comprehensive results?

2
Wed Aug 27, 2025, 7:23 pm

Protected or preserved trees in calculator

Pilot-Credits SSpc158:Onsite Carbon Sequestration Through Plantings
posted by  Courtney France  on 

For 'Protected', or preserved, trees on an existing site, are teams required to include them in BOTH the baseline and design case i-Tree calculations?  Exclude from both cases to avoid extra d

1
Thu Aug 21, 2025, 7:28 pm

Inclusive Design Pilot Credit

Pilot-Credits INpc125:Inclusive Design
posted by  CodeGreen Solutions  on 

Pilot Credit Registration Required Post: Our project chose to pursue this credit because creating a safe, inclusive space for all employees and visitors was very important to the project owners.

10
Tue Aug 19, 2025, 8:34 pm

Phased Core & Shell + CI Project

LEED Rating System Selection
posted by  Mauricio Feldsberg  on 

My client is going to renovate a building that they currently own and will be the sole tenant of.

0

Integrative Analysis of Building Materials-- How to Get Manufacturer Buy-In?

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Marina Rullo  on 

I've completed this pilot credit a few times now, and I'm wondering if anyone else has thought about this: what is the incentive for manufacturers to disclose this information upfront?

0

Baseline Energy Model - Outside Air Ventilation Rate for Zoo Spaces

NC-v4 EAp2:Minimum energy performance
posted by  Mini Laird  on 

We would like to confirm our approach to determining the outside air ventilation rate for a Zoo project for the Baseline energy model, specifically for an animal holding area.

0