Forum quick links
INpc 137 Safety First: Cleaning your space for emerging pathogens
NC-v4 INc1:Innovationposted by Glen Boldt on
What are some other testing strips that are readily available to test the cleanliness of a surface?
Determining Retention Requirements
NC-v4.1 SSc4:Rainwater Managementposted by Callie Reymann on
Our rainwater calculations are right on the cusp of reaching the 90th percentile and earning the full three points (+ regional priority point) for this credit.
Using Autocase to document SSpc113
Pilot-Credits SSpc113:Informing Design Using Triple Bottom Line Analysisposted by Jennifer Wehling on
We used Autocase to document this pilot credit.
Design for Indoor Air Quality and Infection Control Documentation
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Katherine Tich on
Anyone with experience documenting this credit - did you submit with the design credits or with the construction credits?
Stakeholder Engagement
Pilot-Credits INpc122:Informing Design by Major Credit Category Using Triple Bottom Line Analysisposted by Mansoureh Jalali on
What strategies or best practices can help project teams engage stakeholders in the Triple Bottom Line analysis to ensure diverse perspectives and comprehensive results?
Protected or preserved trees in calculator
Pilot-Credits SSpc158:Onsite Carbon Sequestration Through Plantingsposted by Courtney France on
For 'Protected', or preserved, trees on an existing site, are teams required to include them in BOTH the baseline and design case i-Tree calculations? Exclude from both cases to avoid extra d
Inclusive Design Pilot Credit
Pilot-Credits INpc125:Inclusive Designposted by CodeGreen Solutions on
Pilot Credit Registration Required Post: Our project chose to pursue this credit because creating a safe, inclusive space for all employees and visitors was very important to the project owners.
Phased Core & Shell + CI Project
posted by Mauricio Feldsberg on
My client is going to renovate a building that they currently own and will be the sole tenant of.
Integrative Analysis of Building Materials-- How to Get Manufacturer Buy-In?
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Marina Rullo on
I've completed this pilot credit a few times now, and I'm wondering if anyone else has thought about this: what is the incentive for manufacturers to disclose this information upfront?
Baseline Energy Model - Outside Air Ventilation Rate for Zoo Spaces
NC-v4 EAp2:Minimum energy performanceposted by Mini Laird on
We would like to confirm our approach to determining the outside air ventilation rate for a Zoo project for the Baseline energy model, specifically for an animal holding area.