Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent
3
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Dec 21, 2017, 5:58 am

LEED Deliverables from EnergyPro - Purchased Campus Utilities

NC-2009 EAp2:Minimum Energy Performance
posted by  Evan Friesen  on 

Hello, I am working on a project in Davis. The building utilizes campus (district) steam for heating and chilled water for cooling.

0

Inclusion of total building in density calculation

CI-v4 LTc2:Surrounding density and diverse uses
posted by  Deborah Stadler  on 

What happens when the 1/4 mile from the project boundary bisects a dense building?  Can the whole building be included in the calculation?  Only the part of the building that is in the 1/

1
Wed Dec 20, 2017, 12:11 am

Building Add-on to Design-Build Parking Structure

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  GBD Architects  on 

We are pursuing an office project that would be essentially an addition to a parking structure that is being built design-build just several months in advance of when our work would take place.

1
Thu Jan 4, 2018, 5:13 pm

Where do you find the "Mitigated Design Storm Rainfall Volume" for the entire site (cu ft)?

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  bryan lauer  on 

For Miami-Dade County, FL.

In the SSc6 form, where do I find the "Mitigated design rainfall volume for the entire site (cu ft)?  In the building 

1
Mon Jan 15, 2018, 11:05 pm

O+M Starter Kit for CI

CI-v4 INc1:Innovation
posted by  Kristen Magnuson  on 

Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.

1
Thu Dec 14, 2017, 10:59 pm

Service Sink Baseline flow

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jorge Torres-Coto  on 

I have a project that includes mainly Vocational Classrooms.  As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta

0

Small addition to existing building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Edmée Knight  on 

Our project is a small addition (<10% of total building GSF) to an existing building.

1
Tue Dec 12, 2017, 10:19 pm

Fundamental Commissioning Timeline

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Todd Bundren  on 

I am working on a project where the Owner Project Requirements and Basis of Design were created at the appropriate times.

1
Fri Dec 15, 2017, 5:26 pm