Forum quick links
Exterior composite wood covered?
NC-v4 EQc2:Low emitting materialsposted by Craig Graber on
For non-HC or School projects, does this credit cover EXTERIOR composite wood? Credit requirements and Ref.
Pneumatic Controls - Monitoring Based Cx
CI-v4 EAc1:Enhanced commissioningposted by Christopher Lim on
I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building.
Confirm: Tenant WE calc can include Base Building rainwater system
CI-v4 WEp1:Indoor water use reductionposted by Brian Salazar on
Hello! I have a CI project where the tenant occupies multiple contiguous floors.
ASHRAE 50% AEDG
CI-v4 EAc2:Optimize energy performanceposted by AMY VAN DAM on
Can a project pursue the prescriptive compliance path if there is not a ASHRAE 50% Advanced Energy Design Guide that is specifically applicable to the base building (i.e.
Can't create an ID point for this credit
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Alfonzo Collins on
I want to take an ID credit for having 100% of parking spaces under cover, but when I go to the ID credit form and try to select this credit for exemplary performance, it does not show up among the
Building Products dont meet credit requirements?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Emily Neal on
Our project is registering under V4-CI. We are having difficulty with the MR credits where it requires 20 different products, our project doesn't have 20 products to use.
Controllability of lighting in Stadiums / Arenas
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Stacey Olson on
I'm working on a project (2009 BD&C) that includes an outdoor open air stadium, and indoor facilities that include restrooms, circulation, concessions, team locker rooms, press rooms, etc. I r
Occupant Comfort Survey for residential projects?
NC-v4 INc1:Innovationposted by Erica Downs on
Under v3, residential projects were ineligible for this credit. Does anyone know if they are eligible under this v4 Innovation credit? Thanks!
How to divert 70% of ongoing consumables?
EBOM-v4 MRc4:Solid waste management - ongoingposted by David Baker on
I have a project that is up for recertification next year and wants to pursue the MR credit for diverting ongoing consumables.
Preschool Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Heather Holdridge on
I received a preliminary design phase review comment on a preschool project for this PI form. We entered identical values for the peak and average transient occupancy because the building is