Forum quick links
Fan demand from Performance Outputs tab exceeds fan power from Air-Side HVAC tab
NC-v4 EAp2:Minimum energy performanceposted by Edgar Arevalo on
I have received this question generated by the LEED v4 Minimum Energy Performance calculator stating "The fan demand (as reported in the Performance Outputs tab) for the baseline and/or proposed ex
VOC budget calculation success for partially compliant category?
NC-v4 EQc2:Low emitting materialsposted by Joanna Switzer on
Hi all, Despite following the instructions tab details, I have been encountering Low-emitting spreadsheet/calculator errors when attempting to generate assembly calculations to overcome several (g
Duct-mounted CO2 monitors
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Edgar Arevalo on
The design for a current building involves installing CO2 sensors in the return duct of each densely occupied space rather than inside of the space itself. Since the LEED v4 BD+C handboo
HVAC only project
posted by Krysta Aten-Schell on
Looking for guidance on HVAC-only scope project. We are preparing a proposal for an exsiting DoD facility on an Army Base. The RFP requires minimum LEED Silver Certification (formal cer
LEED Indoor water use calculator
NC-v4 WEc2:Indoor water use reductionposted by Jason Garvens on
If a project is using reclaimed greywayter and rainwater stored in a cistern to flush toilets in a building how would one properly account for that on the LEED Indoor water use reduction calculator
Formaldehyde levels too high in ONE room
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Jenni Betancourt on
For a current higher education project, they performed the Air Testing and it shows everything in compliance except for one room showed a level out of compliance for Formaldehyde.
OPTION 1. METERING - tenant level meters
CI-v4 EAc3:Advanced energy meteringposted by Matt Edwards on
Our tenant space consists of 1 full floor and part of another floor in a high rise office building. We would like to know whether the design as described below would meet
Exceptional calculation in newer credit templates for v3 (2009)
NC-2009 EAp2:Minimum Energy Performanceposted by Jill Kurtz on
The exceptional calculations used to be entered into the LEED template but with the streamlined templates, the tables are no longer included in the form.
Bar Space
CI-v4 EQc9:Acoustic performanceposted by Kevin Gilleran on
Hi. We are working on a TI within a shell building which will have a bar, seating, lounge area, kitchen prep areas with support spaces and its own restrooms. No office function etc.
Flush out option -1 for spaces like Stairwells and Elevator shafts
NC-v4 EQc4:Indoor air quality assessmentposted by Nishank Shah on
According to the language used in this credit, we are supposed to perform a building flush-out of the gross floor area.